Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/23/2024
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031) REV1: Option added to garage: 6080 garage door ILO of window.

Permit Reviews

Permit Number - TC-MDP-0924-01015
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031) REV1: Option added to garage: 6080 garage door ILO of window.
Start Date Submittal Complete Date Status  
12/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/08/2025 APPROVED Review Details
02/07/2025 SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 02/07/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01015
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031) REV1: Option added to garage: 6080 garage door ILO of window.
Total Outstanding Activity Conditions - 5
Date Name
09/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/26/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/26/2024 Post-Installed Anchor Inspection Report is required.
12/26/2024 Post-Tension Inspection Report is required.
12/26/2024 Soils testing special condition is required per provided SI Certificate.

Conditions

Permit Number - TC-MDP-0924-01015
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031) REV1: Option added to garage: 6080 garage door ILO of window.
Date Description Comments
12/26/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01015
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031) REV1: Option added to garage: 6080 garage door ILO of window.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/24/2025 COT - RSEL - Electrical Underground N/A Complete (Recurring)

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01015
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031) REV1: Option added to garage: 6080 garage door ILO of window.
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/14/2025 COT - RSPL - Yard Water Line Passed Passed inspection 2/14/25 ok to backfill
02/14/2025 COT - RSPL - Sewer Passed Passed inspection 2/14/25 ok to backfill
02/14/2025 COT - RSPL - Rough Soil Passed Passed inspection 2/14/25 ok to backfill
02/14/2025 COT - RSPL - Backwater Valve Passed Passed inspection 2/14/25 ok to backfill
02/24/2025 COT - RSEL - Grounding/Bonding Passed
02/24/2025 COT - RSBU - Preslab Passed
02/24/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/14/2025 COT - RSBU - Roof Nailing Passed
03/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/14/2025 COT - RSEL - Electrical Underground Passed
04/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 4/2/25 ok to drywall
04/02/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO 4/2/25
04/02/2025 COT - RSPL - Gas Pressure Test Passed Passed 4/2/25 ok to drywall
04/14/2025 COT - RSBU - Interior Shear Bracing Passed
06/05/2025 COT - BULD - SWG Clearance Passed 6-5-25: okay for SWG to install meter. Clearance issued.
06/17/2025 COT - RSEL - Outdoor Lighting Passed
06/17/2025 COT - RSPL - Plumbing Final Passed
06/20/2025 COT - RSME - Mechanical Final Passed
06/20/2025 ENGR Engineering Final Passed Site is clean and safe, in accordance with approved plans. CofO ready.
06/20/2025 RSBU - Building Progress Passed
06/25/2025 RSBU - Building Final Passed 6/25/25 passed
06/25/2025 COT - RSEL - Electrical Final Passed 6/25/25 passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
2_SITEPLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-12-23_V1.PDF DOCUMENTS VIEW