Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/17/2024
Applicant:
Andrea Flood
Description:
SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)

Permit Reviews

Permit Number - TC-MDP-0924-01014
Permit Status: Inspections complete
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Start Date Submittal Complete Date Status  
09/20/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/25/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01014
Permit Status: Inspections complete
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Total Outstanding Activity Conditions - 6
Date Name
09/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/24/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/24/2024 Post-Tension Inspection Report is required.
09/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0924-01014
Permit Status: Inspections complete
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Date Description Comments
09/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01014
Permite Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/06/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass Partial pass for Ufer ground. Okay to pour concrete.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01014
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/25/2024 COT - RSPL - Rough Soil Passed 10-25-24, underground plumbing inspection approved. Okay to backfill.
10/25/2024 COT - RSPL - Sewer Passed 10-25-24, sewer line connection inspection approved. Okay to backfill.
10/25/2024 COT - RSPL - Yard Water Line Passed 10-25-24, main water line inspection approved. Okay to backfill.
11/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Okay to pour concrete.
11/06/2024 COT - RSBU - Preslab Passed Okay to pour concrete.
11/06/2024 COT - RSEL - Electrical Underground Passed Okay to pour concrete.
12/03/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12-3-24, exterior clip/sheathing, truss bracing and roof nailing approved. Okay to continue with construction.
12/03/2024 COT - RSBU - Roof Nailing Passed 12-3-24, exterior clip/sheathing, truss bracing and roof nailing approved. Okay to continue with construction.
01/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/6/25 passed ok to proceed
01/06/2025 COT - RSEL - Grounding/Bonding Passed 1/6/25 passed ok to proceed
01/06/2025 COT - RSPL - Gas Pressure Test Passed Holds pressure 1/6/25
01/10/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
01/21/2025 COT - RSBU - Interior Shear Bracing Passed 1-21-25, approved. Okay for tape & texture
03/11/2025 COT - BULD - SWG Clearance Passed 11 Mar 25
Southwest gas Clearance: SWG
03/20/2025 COT - RSEL - Outdoor Lighting Passed 3-20-25, approved
03/20/2025 ENGR Engineering Final Passed CO Ready
03/20/2025 RSBU - Building Progress Passed
03/21/2025 COT - RSEL - Electrical Final Passed 3/21/25 passed final CLEARANCE ECO
03/21/2025 COT - RSME - Mechanical Final Passed 3/21/25 passed final
03/21/2025 COT - RSPL - Plumbing Final Passed 3/21/25 passed final
03/21/2025 RSBU - Building Final Passed 3/21/25 passed final

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INPSECTION CERT-2024-09-17_V1.PDF DOCUMENTS VIEW