Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
2012 E RIVER RD BLDG 6
Apply Date:
09/17/2024
Applicant:
Description:
CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUILDING 6

Permit Reviews

Permit Number - TC-MDP-0924-00990
Permit Status: Complete
Permit Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUILDING 6
Start Date Submittal Complete Date Status  
07/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/25/2025 APPROVED Review Details
07/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/17/2025 REQUIRES RESUBMIT Review Details
09/24/2024 COMMERCIAL REVIEW - FULL v.1 10/09/2024 APPROVED Review Details
07/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/22/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-00990
Permit Status: Complete
Permit Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUILDING 6
Date Description Comments
10/14/2024 AIR BALANCING REPORT IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/11/2024 Post-Tension Inspection Report is required.
09/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/22/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/22/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-00990
Permite Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUILDING 6
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
02/19/2025 COT - LCME - Mechanical Intermediate N/A Partial Pass
07/18/2025 COT - BULD - SWG Clearance N/A Not Applicable
04/01/2025 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass 101,103,104,105,200,201,202 okay to proceed progress areas. 4/1/25
07/18/2025 COT - LCPL - Gas Pressure Test N/A Not Applicable
11/13/2024 COT - HCBU - Stem Wall/Retaining Wall N/A Partial Pass Stairwell stem walls approved both north and south ends. Okay for concrete placement. 11/13/2024
07/24/2025 COT - FCON - Sprinkler - Final N/A Partial Pass Unit 201 missing trim in pantry, unit 203 storage closet hole around trim, riser room missing trim.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-00990
Permit Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUILDING 6
Total Completed Inspections - 29
Date Description Inspector Results Comments
10/15/2024 COT - LCBU - Roof Nailing Passed
02/20/2025 COT - LCPL - Plumbing Intermediate Passed
02/20/2025 COT - LCBU - Building Above Ceiling Passed
02/24/2025 COT - LCME - Mechanical Intermediate Passed
05/07/2025 BULD - Electrical Clearance Passed 104,101,102,103,100,105,205,204,200,203,201,202. Clearance for TEP ECO. Building 2012. 5/7/2025
05/19/2025 COT - LCEL - Electrical Above Ceiling Passed
07/18/2025 COT - LCBU - Exterior Clips/Sheathing Passed
07/18/2025 COT - LCBU - Preslab Passed
07/18/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
07/18/2025 COT - LCEL - Grounding/Bonding Passed
07/18/2025 COT - LCPL - Plumbing Above Ceiling Passed
07/18/2025 COT - LCPL - Rough Soil Passed
07/18/2025 COT - LCPL - Sewer Passed
07/18/2025 COT - LCPL - Yard Water Line Passed
07/18/2025 COT - HCBU - Stem Wall/Retaining Wall Passed
07/22/2025 COT - LCBU - Framing Passed
07/22/2025 COT - LCEL - Electrical Intermediate Passed
07/22/2025 COT - LCEL - Electrical Underground Passed
07/22/2025 COT - LCME - Mechanical Above Ceiling Passed
07/24/2025 TRSP - ROW - Final/Close-Out Passed
07/25/2025 COT - LCEL - Electrical Final Passed
07/25/2025 COT - LCME - Mechanical Final Passed
07/25/2025 COT - LCPL - Plumbing Final Passed
07/25/2025 COT - LCEL - Outdoor Lighting Passed
07/25/2025 ENGR Engineering Final Passed Site is clear and accessible. Landscaping and flat work are complete.
07/28/2025 COT - FCON - Alarm - Final Passed
07/28/2025 COT - FCON - Sprinkler - Final Passed
07/28/2025 COT - FCON - Fire - Final Passed
07/30/2025 COT - LCBU - Building Final Passed