Permit: TC-MDP-0923-01591
Permit Details
Apply Date:
09/28/2023
Applicant:
Joshua Swinney
Description:
Roosevelt Model SFR La Estancia (Revision 1 Truss)
Permit Reviews
Permit Number - TC-MDP-0923-01591
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/02/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/04/2023 | APPROVED |
10/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01591
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Date | Description | Comments |
---|---|---|
10/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/02/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/16/2023 | Post-Tension Inspection Report is required. | |
10/15/2024 | Post-Tension Inspection Report is required. | |
08/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/15/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
10/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
02/16/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
10/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01591
Permite Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
05/16/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01591
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Total Completed Inspections - 19