Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/28/2023
Applicant:
Joshua Swinney
Description:
Roosevelt Model SFR La Estancia (Revision 1 Truss)

Permit Reviews

Permit Number - TC-MDP-0923-01590
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Start Date Submittal Complete Date Status  
10/02/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/04/2023 APPROVED Review Details
10/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/15/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0923-01590
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Date Description Comments
10/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/02/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/16/2023 Post-Tension Inspection Report is required.
10/15/2024 Post-Tension Inspection Report is required.
08/03/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/15/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01590
Permite Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/08/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
05/15/2024 COT - BULD - SWG Clearance N/A Not Applicable
07/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Partial pass. Pending 15 minutes minimum test on DWV. Pex lines out of wall in master bathroom. 7/22/2024
09/11/2024 BULD - Electrical Clearance N/A Not Ready Missing breakers, connections

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01590
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/08/2024 COT - RSPL - Sewer Passed
05/08/2024 COT - RSPL - Rough Soil Passed
05/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/15/2024 COT - RSBU - Preslab Passed
05/15/2024 COT - RSEL - Electrical Underground Passed
06/12/2024 COT - RSBU - Roof Nailing Passed
06/20/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/21/2024 COT - RSPL - Yard Water Line Passed 6/21/24: under test
07/25/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 7/25/2024
08/09/2024 COT - RSBU - Interior Shear Bracing Passed
09/25/2024 BULD - Electrical Clearance Passed TEP ECO
09/25/2024 COT - RSEL - Grounding/Bonding Passed
10/23/2024 COT - RSEL - Outdoor Lighting Passed 10-23-24, approved.
10/23/2024 RSBU - Building Progress Passed
10/29/2024 COT - RSME - Mechanical Final Passed 10-29-24, listed items requiring correction have been made. Building final approved.
10/29/2024 COT - RSEL - Electrical Final Passed 10-29-24, listed items requiring correction have been made. Building final approved.
10/29/2024 COT - RSPL - Plumbing Final Passed 10-29-24, listed items requiring correction have been made. Building final approved.
10/29/2024 ENGR Engineering Final Passed
10/29/2024 RSBU - Building Final Passed 10-29-24, listed items requiring correction have been made. Building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA DE TUCSON PHASE II BELLA VITA - PARCEL 6 FINAL SIC - LOT 6094-2024-10-10_V1.PDF DOCUMENTS VIEW
Z370 ROOSEVELT- TRUSS REVIEW LETTER - LAYOUT (STAMPED)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW