Status:
Issued
Type:
Model Building Permit
Apply Date:
04/03/2023
Applicant:
Christi Swenson
Description:
SFR PULT3513-2 T21-M0056

Permit Reviews

Permit Number - TC-MDP-0923-01582
Permit Status: Issued
Permit Description: SFR PULT3513-2 T21-M0056
Start Date Submittal Complete Date Status  
04/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/11/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01582
Permit Status: Issued
Permit Description: SFR PULT3513-2 T21-M0056
Total Outstanding Activity Conditions - 5
Date Name
04/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/11/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/11/2024 Post-Tension Inspection Report is required.
04/11/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0923-01582
Permit Status: Issued
Permit Description: SFR PULT3513-2 T21-M0056
Date Description Comments
09/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0923-01582
Permite Description: SFR PULT3513-2 T21-M0056
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/29/2024 COT - RSPL - Gas Pressure Test N/A Not Ready Roof not loaded. Still working in home. 8/29/2024

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0923-01582
Permit Description: SFR PULT3513-2 T21-M0056
Total Completed Inspections - 13
Date Description Inspector Results Comments
06/25/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 6/25/2024
06/25/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 6/25/2024
06/25/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 6/25/2024
07/02/2024 COT - RSBU - Preslab Passed
07/02/2024 COT - RSEL - Electrical Underground Passed
07/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/24/2024 COT - RSBU - Roof Nailing Passed
07/24/2024 COT - RSEL - Grounding/Bonding Passed
07/30/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/30/2024
09/05/2024 COT - RSPL - Gas Pressure Test Passed
09/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 9/10/2024
09/25/2024 COT - RSBU - Interior Shear Bracing Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 03904 - SIC-2024-04-03_V1.PDF DOCUMENTS VIEW
LE 03904_V1.PDF DOCUMENTS VIEW