Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/03/2023
Applicant:
John Hodge
Description:
SFR PULT3513-2 T21-M0056

Permit Reviews

Permit Number - TC-MDP-0923-01578
Permit Status: Inspections complete
Permit Description: SFR PULT3513-2 T21-M0056
Start Date Submittal Complete Date Status  
10/03/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/10/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01578
Permit Status: Inspections complete
Permit Description: SFR PULT3513-2 T21-M0056
Total Outstanding Activity Conditions - 5
Date Name
10/03/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/03/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/03/2023 Post-Tension Inspection Report is required.
10/03/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0923-01578
Permit Status: Inspections complete
Permit Description: SFR PULT3513-2 T21-M0056
Date Description Comments
09/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01578
Permit Description: SFR PULT3513-2 T21-M0056
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/13/2023 COT - RSPL - Yard Water Line Passed
11/13/2023 COT - RSPL - Sewer Passed
11/13/2023 COT - RSPL - Rough Soil Passed
11/16/2023 COT - RSBU - Preslab Passed
11/16/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/16/2023 COT - RSEL - Electrical Underground Passed
12/11/2023 COT - RSBU - Roof Nailing Passed
12/11/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/25/2024 COT - RSPL - Gas Pressure Test Passed
01/25/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/25/2024 COT - RSEL - Grounding/Bonding Passed
01/25/2024 RSBU - Building Progress Passed
01/25/2024 BULD - Electrical Clearance Passed
02/01/2024 COT - BULD - SWG Clearance Passed
02/09/2024 COT - RSBU - Interior Shear Bracing Passed
04/16/2024 COT - RSEL - Outdoor Lighting Passed
04/16/2024 COT - RSPL - Backwater Valve Passed
04/16/2024 COT - RSPL - Plumbing Final Passed
04/16/2024 ENGR Engineering Final Passed Definite grade swale in rear yard, appears to be correct on sides and good with drainage to front.
04/18/2024 COT - RSEL - Electrical Final Passed
04/18/2024 COT - RSME - Mechanical Final Passed
04/18/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 05504 - SIC-2023-10-03_V1.PDF DOCUMENTS VIEW
LE 05504_V1.PDF DOCUMENTS VIEW