Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/28/2023
Applicant:
Joshua Swinney
Description:
Harding SFR Model La Estancia (roof vent update)

Permit Reviews

Permit Number - TC-MDP-0923-01571
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
Start Date Submittal Complete Date Status  
10/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/15/2024 APPROVED Review Details
10/02/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/04/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0923-01571
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
Date Description Comments
10/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/02/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/16/2023 Post-Tension Inspection Report is required.
10/15/2024 Post-Tension Inspection Report is required.
08/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/15/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01571
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/08/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
05/15/2024 COT - BULD - SWG Clearance N/A Not Applicable
10/04/2024 BULD - Electrical Clearance N/A Not Ready Not ready, missing breakers and wiring

NOT READY. 10/4/2024.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01571
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/08/2024 COT - RSPL - Sewer Passed
05/08/2024 COT - RSPL - Rough Soil Passed
05/15/2024 COT - RSEL - Electrical Underground Passed
05/15/2024 COT - RSBU - Preslab Passed
05/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/20/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/20/2024 COT - RSBU - Roof Nailing Passed
06/21/2024 COT - RSPL - Yard Water Line Passed
08/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/30/2024 COT - RSBU - Interior Shear Bracing Passed
10/23/2024 BULD - Electrical Clearance Passed 10-23-24, approved for electrical clearance to TEP.
11/08/2024 COT - RSEL - Electrical Final Passed Passed
11/08/2024 COT - RSEL - Grounding/Bonding Passed Passed
11/08/2024 COT - RSEL - Outdoor Lighting Passed Passed
11/08/2024 COT - RSME - Mechanical Final Passed Passed
11/08/2024 COT - RSPL - Plumbing Final Passed Passed
11/08/2024 ENGR Engineering Final Passed CO Ready
11/08/2024 RSBU - Building Final Passed Passed
11/08/2024 RSBU - Building Progress Passed Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA DE TUCSON PHASE II BELLA VITA - PARCEL 6 FINAL SIC - LOT 6095-2024-10-10_V1.PDF DOCUMENTS VIEW
Z350 HARDING- TRUSS REVIEW LETTER - LAYOUT (STAMPED)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOCK 6 LOT 95 PLOT PLAN_V1.PDF DOCUMENTS VIEW