Permit: TC-MDP-0923-01565
Permit Details
Apply Date:
10/26/2023
Applicant:
Craig Morczynski
Description:
LE23001 T22-M0058
Permit Reviews
Permit Number - TC-MDP-0923-01565
Permit Status: Issued
Permit Description: LE23001 T22-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/27/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/02/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0923-01565
Permit Status: Issued
Permit Description: LE23001 T22-M0058
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
10/27/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
10/27/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
10/27/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0923-01565
Permit Status: Issued
Permit Description: LE23001 T22-M0058
Date | Description | Comments |
---|---|---|
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0923-01565
Permit Description: LE23001 T22-M0058
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/04/2023 | COT - RSPL - Yard Water Line | Passed | water line is connected to main water meter. | |
12/04/2023 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to the main sewer line. Okay to shade pipes and backfill trenches. | |
12/04/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to the main sewer line. Okay to shade pipes and backfill trenches. | |
12/11/2023 | COT - RSBU - Preslab | Passed | ||
12/11/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/11/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
01/03/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/03/2024 | COT - RSBU - Roof Nailing | Passed | ||
02/28/2024 | BULD - Electrical Clearance | Passed | ||
03/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/14/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/14/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
03/14/2024 | RSBU - Building Progress | Passed | ||
03/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/29/2024 | COT - BULD - SWG Clearance | Passed | ||
06/05/2024 | RSBU - Building Final | Passed |