Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0923-01561
Permit Details
Apply Date:
05/13/2023
Applicant:
Description:
VC 1728-130
Permit Reviews
Permit Number - TC-MDP-0923-01561
Permit Status: Inspections complete
Permit Description: VC 1728-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/16/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0923-01561
Permit Status: Inspections complete
Permit Description: VC 1728-130
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
04/03/2023 | Post-Tension Inspection Report is required. |
04/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
05/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/20/2024 | Post-Tension Inspection Report is required. |
05/20/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
05/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0923-01561
Permit Status: Inspections complete
Permit Description: VC 1728-130
Date | Description | Comments |
---|---|---|
05/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
09/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01561
Permite Description: VC 1728-130
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2024 | COT - RSBU - Roof Nailing | N/A | Canceled | Canceled per contractor. 7/11/2024 |
07/11/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Canceled | Canceled per contractor. 7/11/2024 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01561
Permit Description: VC 1728-130
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/11/2024 | COT - RSPL - Sewer | Passed | ||
06/11/2024 | COT - RSPL - Rough Soil | Passed | ||
06/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/20/2024 | COT - RSBU - Preslab | Passed | ||
06/20/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/30/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/30/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/12/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/13/2024 | |
08/16/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/16/2024 | |
08/21/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/02/2024 | COT - BULD - SWG Clearance | Passed | 10/2/24: SWG clearance Meter tag | |
10/23/2024 | COT - RSEL - Electrical Final | Passed | 10-23-24, electrical final approved. | |
10/23/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-23-24, outdoor lighting approved. | |
10/23/2024 | COT - RSME - Mechanical Final | Passed | 10-23-24, mechanical final approved. | |
10/23/2024 | COT - RSPL - Plumbing Final | Passed | 10-23-24, final plumbing inspection approved. | |
10/23/2024 | ENGR Engineering Final | Passed | CO Ready | |
10/23/2024 | RSBU - Building Final | Passed | 10-23-24, building final approved. | |
10/23/2024 | RSBU - Building Progress | Passed |