Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/13/2023
Applicant:
Description:
VC 1728-130

Permit Reviews

Permit Number - TC-MDP-0923-01561
Permit Status: Inspections complete
Permit Description: VC 1728-130
Start Date Submittal Complete Date Status  
05/16/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/21/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01561
Permit Status: Inspections complete
Permit Description: VC 1728-130
Total Outstanding Activity Conditions - 7
Date Name
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
05/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/20/2024 Post-Tension Inspection Report is required.
05/20/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/20/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0923-01561
Permit Status: Inspections complete
Permit Description: VC 1728-130
Date Description Comments
05/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01561
Permite Description: VC 1728-130
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/11/2024 COT - RSBU - Roof Nailing N/A Canceled Canceled per contractor. 7/11/2024
07/11/2024 COT - RSBU - Exterior Clips/Sheathing N/A Canceled Canceled per contractor. 7/11/2024

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01561
Permit Description: VC 1728-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/11/2024 COT - RSPL - Yard Water Line Passed
06/11/2024 COT - RSPL - Sewer Passed
06/11/2024 COT - RSPL - Rough Soil Passed
06/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/20/2024 COT - RSBU - Preslab Passed
06/20/2024 COT - RSEL - Electrical Underground Passed
06/20/2024 COT - RSEL - Grounding/Bonding Passed
07/30/2024 COT - RSBU - Roof Nailing Passed
07/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/12/2024 COT - RSPL - Gas Pressure Test Passed
08/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 8/13/2024
08/16/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/16/2024
08/21/2024 COT - RSBU - Interior Shear Bracing Passed
10/02/2024 COT - BULD - SWG Clearance Passed 10/2/24: SWG clearance Meter tag
10/23/2024 COT - RSEL - Electrical Final Passed 10-23-24, electrical final approved.
10/23/2024 COT - RSEL - Outdoor Lighting Passed 10-23-24, outdoor lighting approved.
10/23/2024 COT - RSME - Mechanical Final Passed 10-23-24, mechanical final approved.
10/23/2024 COT - RSPL - Plumbing Final Passed 10-23-24, final plumbing inspection approved.
10/23/2024 ENGR Engineering Final Passed CO Ready
10/23/2024 RSBU - Building Final Passed 10-23-24, building final approved.
10/23/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RESERVES AT VALENCIA CROSSING - LOT 14 START_V1.PDF DOCUMENTS VIEW
RVC 14 SIC-2024-05-13_V1.PDF DOCUMENTS VIEW