Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0923-01559
Permit Details
Status:
Issued
Type:
Model Building Permit
Address:
6392 S AMBARELLA DR
Address NEW:
6392 S AMBARELLA DR
Apply Date:
09/26/2023
Applicant:
Description:
VC 1728-130
Permit Reviews
Permit Number - TC-MDP-0923-01559
Permit Status: Issued
Permit Description: VC 1728-130
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/27/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0923-01559
Permit Status: Issued
Permit Description: VC 1728-130
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 04/03/2023 | Post-Tension Inspection Report is required. |
| 04/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 09/27/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/27/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/27/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0923-01559
Permit Status: Issued
Permit Description: VC 1728-130
| Date | Description | Comments |
|---|---|---|
| 09/28/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |