Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/21/2023
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030

Permit Reviews

Permit Number - TC-MDP-0923-01541
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Start Date Submittal Complete Date Status  
09/22/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/25/2023 APPROVED Review Details
02/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0923-01541
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
09/22/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/22/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/22/2023 Post-Tension Inspection Report is required.
09/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/04/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
09/22/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01541
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/21/2023 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required Add anchor bolts in garage, add anchor bolt at back of house, no truss calcs present.
12/21/2023 COT - RSPL - Yard Water Line N/A Re-inspection required Not under test.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01541
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/20/2023 COT - RSPL - Backwater Valve Passed
11/20/2023 COT - RSPL - Rough Soil Passed
11/20/2023 COT - RSPL - Sewer Passed
11/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/29/2023 COT - RSBU - Preslab Passed
11/29/2023 COT - RSEL - Grounding/Bonding Passed
11/29/2023 COT - RSEL - Electrical Underground Passed
12/21/2023 COT - RSBU - Roof Nailing Passed
01/09/2024 COT - RSBU - Exterior Clips/Sheathing Passed
01/25/2024 COT - RSPL - Yard Water Line Passed
01/29/2024 BULD - Electrical Clearance Passed
02/07/2024 COT - RSPL - Gas Pressure Test Passed
02/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/26/2024 COT - RSBU - Interior Shear Bracing Passed
04/03/2024 COT - BULD - SWG Clearance Passed
04/18/2024 COT - RSEL - Outdoor Lighting Passed
04/18/2024 RSBU - Building Progress Passed
04/18/2024 COT - RSPL - Plumbing Final Passed
04/18/2024 ENGR Engineering Final Passed Clean outs are perfect and grade looks good.
Definite questions on weep holes from yard to the north.
04/22/2024 COT - RSEL - Electrical Final Passed
04/22/2024 COT - RSME - Mechanical Final Passed
04/22/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
144184 PT LOT 113 COMPLETE-2024-02-27_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 113 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 113 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 113 SPECIAL INSPECTION CERTIFICATE-2023-09-21_V1.PDF DOCUMENTS VIEW