Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/19/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0923-01532
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
09/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 09/21/2023 APPROVED Review Details
09/18/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/19/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01532
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 4
Date Name
09/19/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/20/2023 Post-Tension Inspection Report is required.
09/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0923-01532
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
09/14/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01532
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/03/2023 COT - RSPL - Yard Water Line Passed
10/03/2023 COT - RSPL - Sewer Passed
10/03/2023 COT - RSPL - Rough Soil Passed
10/11/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/11/2023 COT - RSBU - Preslab Passed
10/11/2023 COT - RSEL - Electrical Underground Passed
10/11/2023 COT - RSEL - Grounding/Bonding Passed
10/31/2023 COT - RSBU - Roof Nailing Passed
11/03/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/29/2023 BULD - Electrical Clearance Passed TEP sent a ECO Clearance. okay to energize.
12/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical and plumbing rough-in is complete. Okay to proceed with insulation.
12/01/2023 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of air pressure without any leaks. Okay to cover gas pipes.
12/12/2023 COT - RSBU - Interior Shear Bracing Passed
02/07/2024 COT - BULD - SWG Clearance Passed
03/05/2024 COT - RSEL - Electrical Final Passed
03/05/2024 COT - RSEL - Outdoor Lighting Passed
03/05/2024 COT - RSME - Mechanical Final Passed
03/05/2024 ENGR Engineering Final Passed
03/05/2024 COT - RSPL - Plumbing Final Passed
03/05/2024 RSBU - Building Final Passed
03/05/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA 9 SIC-2023-09-19_V2.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 1 - LOT 9 START_V1.PDF DOCUMENTS VIEW