Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/18/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0923-01531
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
09/18/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/20/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01531
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 5
Date Name
09/18/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/18/2023 Post-Installed Anchor Inspection Report is required.
09/20/2023 Post-Tension Inspection Report is required.
09/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0923-01531
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
09/14/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01531
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/26/2023 COT - RSPL - Sewer Passed
09/26/2023 COT - RSPL - Yard Water Line Passed
09/26/2023 COT - RSPL - Rough Soil Passed
10/03/2023 COT - RSEL - Electrical Underground Passed
10/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/03/2023 COT - RSBU - Preslab Passed
10/03/2023 COT - RSEL - Grounding/Bonding Passed
10/24/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/24/2023 COT - RSBU - Roof Nailing Passed
11/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/20/2023 COT - RSPL - Gas Pressure Test Passed
11/22/2023 BULD - Electrical Clearance Passed Approved new service panel, ECO Clearance to TEP is required
12/06/2023 COT - RSBU - Interior Shear Bracing Passed
01/19/2024 COT - BULD - SWG Clearance Passed SWG for meter only
02/15/2024 COT - RSEL - Electrical Final Passed
02/15/2024 COT - RSEL - Outdoor Lighting Passed
02/15/2024 COT - RSME - Mechanical Final Passed
02/15/2024 COT - RSPL - Plumbing Final Passed
02/15/2024 RSBU - Building Progress Passed
02/15/2024 ENGR Engineering Final Passed
02/20/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 54 START_V1.PDF DOCUMENTS VIEW
BELLA TIERRAII 54 SIC-2023-09-18_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW