Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/14/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0923-01530
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
10/05/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/11/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01530
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 5
Date Name
10/05/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/05/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/05/2023 Post-Installed Anchor Inspection Report is required.
10/09/2023 Post-Tension Inspection Report is required.
10/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0923-01530
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
09/14/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01530
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/26/2023 COT - RSPL - Yard Water Line Passed
10/26/2023 COT - RSPL - Sewer Passed
10/26/2023 COT - RSPL - Rough Soil Passed
11/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/03/2023 COT - RSBU - Preslab Passed
11/03/2023 COT - RSEL - Electrical Underground Passed
11/03/2023 COT - RSEL - Grounding/Bonding Passed
11/20/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/20/2023 COT - RSBU - Roof Nailing Passed
12/29/2023 BULD - Electrical Clearance Passed
01/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/5/24: Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
01/05/2024 COT - RSPL - Gas Pressure Test Passed 1/5/24: Gas lines are under 15# of compressed air without leaks.
01/17/2024 COT - RSBU - Interior Shear Bracing Passed
03/08/2024 COT - BULD - SWG Clearance Passed CLEAR GAS
03/18/2024 COT - RSEL - Electrical Final Passed Construction is completed. Mechanical, plumbing, and electrical fixtures are installed and operational. GFCI & AFCI Breakers are installed in electrical panel for kitchen, bathroom, garage & exterior outlets, and for bedroom outlets. Okay to issue Certificate of Occupancy once all other departments have completed their inspections and approved for occupancy.
03/18/2024 COT - RSEL - Outdoor Lighting Passed Exterior lights are what is called out on plans they are properly installed and operational.
03/18/2024 COT - RSME - Mechanical Final Passed Construction is completed. Mechanical, plumbing, and electrical fixtures are installed and operational. GFCI & AFCI Breakers are installed in electrical panel for kitchen, bathroom, garage & exterior outlets, and for bedroom outlets. Okay to issue Certificate of Occupancy once all other departments have completed their inspections and approved for occupancy.
03/18/2024 COT - RSPL - Plumbing Final Passed Construction is completed. Mechanical, plumbing, and electrical fixtures are installed and operational. GFCI & AFCI Breakers are installed in electrical panel for kitchen, bathroom, garage & exterior outlets, and for bedroom outlets. Okay to issue Certificate of Occupancy once all other departments have completed their inspections and approved for occupancy.
03/18/2024 RSBU - Building Final Passed Construction is completed. Mechanical, plumbing, and electrical fixtures are installed and operational. GFCI & AFCI Breakers are installed in electrical panel for kitchen, bathroom, garage & exterior outlets, and for bedroom outlets. Okay to issue Certificate of Occupancy once all other departments have completed their inspections and approved for occupancy.
03/18/2024 RSBU - Building Progress Passed Construction is completed. Mechanical, plumbing, and electrical fixtures are installed and operational. GFCI & AFCI Breakers are installed in electrical panel for kitchen, bathroom, garage & exterior outlets, and for bedroom outlets. Okay to issue Certificate of Occupancy once all other departments have completed their inspections and approved for occupancy.
03/18/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA II 52 SIC-2023-10-04_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 52 START_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW