Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/12/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0923-01529
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
10/12/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/17/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01529
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 4
Date Name
10/12/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/12/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/12/2023 Post-Installed Anchor Inspection Report is required.
10/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0923-01529
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
10/17/2023 ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2021-034/P21WP00207 IS ACCEPTED AND RELEASED PCRWRD
09/14/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01529
Permite Description: SFR BT1383-130 T22-M0014
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/17/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 4/17/24: cut clean out in driveway to grade add metal cap.
04/17/2024 RSBU - Building Final N/A Re-inspection required 4/17/24: cut clean out in driveway to grade add metal cap.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01529
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/03/2023 COT - RSPL - Rough Soil Passed
11/03/2023 COT - RSPL - Yard Water Line Passed
11/03/2023 COT - RSPL - Sewer Passed
11/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/20/2023 COT - RSBU - Preslab Passed
11/20/2023 COT - RSEL - Electrical Underground Passed
11/20/2023 COT - RSEL - Grounding/Bonding Passed
12/05/2023 COT - RSBU - Exterior Clips/Sheathing Passed
12/05/2023 COT - RSBU - Roof Nailing Passed
01/22/2024 BULD - Electrical Clearance Passed TEP ECO
02/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/07/2024 COT - RSPL - Gas Pressure Test Passed
02/20/2024 COT - RSBU - Interior Shear Bracing Passed
03/26/2024 COT - BULD - SWG Clearance Passed
04/17/2024 COT - RSEL - Electrical Final Passed
04/17/2024 COT - RSEL - Outdoor Lighting Passed
04/17/2024 COT - RSME - Mechanical Final Passed
04/17/2024 RSBU - Building Progress Passed
04/16/2024 ENGR Engineering Final Passed
04/18/2024 COT - RSPL - Plumbing Final Passed
04/19/2024 RSBU - Building Final Passed 4-19-24: Clean out has been cut to grade and a metal cap installed to protect pipe. Okay to issue Certificate of Occupancy for this project at 8857 E Raven Hill Way.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA II 50 SIC-2023-10-12_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 50 START_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW