Permit: TC-MDP-0923-01520
Permit Details
Apply Date:
09/13/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0923-01520
Permit Status: Issued
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/07/2024 | APPROVED |
08/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/08/2024 | APPROVED |
07/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01520
Permit Status: Issued
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
07/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/01/2024 | Post-Tension Inspection Report is required. | |
07/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0923-01520
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2024 | COT - RSPL - Sewer | Passed | ||
05/30/2024 | COT - RSPL - Rough Soil | Passed | ||
05/30/2024 | COT - RSPL - Backwater Valve | Passed | ||
05/31/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/31/2024 | COT - RSBU - Preslab | Passed | ||
07/31/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/31/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/31/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/31/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/29/2024 | BULD - Electrical Clearance | Passed | ||
09/10/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/13/2024 | RSBU - Building Progress | Passed | ||
10/08/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
10/08/2024 | COT - RSBU - Interior Shear Bracing | Passed |