Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1827 S POETRY LN
Apply Date:
09/13/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0923-01517
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
05/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/07/2024 REQUIRES RESUBMIT Review Details
02/16/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/26/2024 APPROVED Review Details
02/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/15/2024 REQUIRES RESUBMIT Review Details
07/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2024 APPROVED Review Details
05/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/09/2024 REQUIRES RESUBMIT Review Details
05/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 05/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0923-01517
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
02/14/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/13/2024 Post-Tension Inspection Report is required.
05/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/13/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01517
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
03/22/2024 COT - RSBU - Preslab N/A Re-inspection required 3/22/24: ufer needs to be moved to northwest corner, stationary end of PT can only expose 1" of cable
03/22/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 3/22/24: ufer needs to be moved to northwest corner, stationary end of PT can only expose 1" of cable
03/22/2024 COT - RSEL - Grounding/Bonding N/A Re-inspection required 3/22/24: ufer needs to be moved to northwest corner, stationary end of PT can only expose 1" of cable
09/13/2024 COT - RSME - Mechanical Final N/A Canceled 9/13/24: canceled per contractor
09/13/2024 RSBU - Building Final N/A Canceled 9/13/24: canceled per contractor
09/13/2024 COT - RSPL - Yard Water Line N/A Canceled 9/13/24: canceled per contractor
09/13/2024 COT - RSEL - Outdoor Lighting N/A Canceled 9/13/24: canceled per contractor
09/13/2024 COT - RSPL - Plumbing Final N/A Canceled 9/13/24: canceled per contractor
09/13/2024 RSBU - Building Progress N/A Canceled 9/13/24: canceled per contractor
09/13/2024 COT - RSEL - Electrical Final N/A Canceled 9/13/24: canceled per contractor

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01517
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
03/15/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
03/15/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
03/15/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
03/22/2024 COT - RSEL - Electrical Underground Passed
03/26/2024 COT - RSBU - Preslab Passed
03/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/30/2024 COT - RSBU - Roof Nailing Passed
04/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/28/2024 BULD - Electrical Clearance Passed TEP ECO
05/28/2024 COT - RSEL - Grounding/Bonding Passed
06/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/17/2024 COT - RSPL - Gas Pressure Test Passed
07/03/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed per BO
07/03/2024 COT - RSBU - Interior Shear Bracing Passed
08/26/2024 COT - BULD - SWG Clearance Passed 8/26/24: SWG CLEARANCE METER TAG
09/12/2024 ENGR Engineering Final Passed
09/18/2024 COT - RSME - Mechanical Final Passed
09/18/2024 RSBU - Building Final Passed
09/18/2024 COT - RSPL - Yard Water Line Passed
09/18/2024 COT - RSEL - Outdoor Lighting Passed
09/18/2024 COT - RSPL - Plumbing Final Passed
09/18/2024 RSBU - Building Progress Passed
09/18/2024 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 39 - 2 -2024-05-13_V3.PDF DOCUMENTS VIEW
CBT 39 COMMENT RESPONCES_V2.PDF DOCUMENTS VIEW
CBT 39 PT CERT-2024-02-13_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW