Permit: TC-MDP-0923-01517
Permit Details
Apply Date:
09/13/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0923-01517
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/07/2024 | REQUIRES RESUBMIT |
02/16/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 02/26/2024 | APPROVED |
02/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/15/2024 | REQUIRES RESUBMIT |
07/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2024 | APPROVED |
05/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/09/2024 | REQUIRES RESUBMIT |
05/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 05/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01517
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
02/14/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/13/2024 | Post-Tension Inspection Report is required. | |
05/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01517
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/22/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 3/22/24: ufer needs to be moved to northwest corner, stationary end of PT can only expose 1" of cable |
03/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 3/22/24: ufer needs to be moved to northwest corner, stationary end of PT can only expose 1" of cable |
03/22/2024 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 3/22/24: ufer needs to be moved to northwest corner, stationary end of PT can only expose 1" of cable |
09/13/2024 | COT - RSME - Mechanical Final | N/A | Canceled | 9/13/24: canceled per contractor |
09/13/2024 | RSBU - Building Final | N/A | Canceled | 9/13/24: canceled per contractor |
09/13/2024 | COT - RSPL - Yard Water Line | N/A | Canceled | 9/13/24: canceled per contractor |
09/13/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 9/13/24: canceled per contractor |
09/13/2024 | COT - RSPL - Plumbing Final | N/A | Canceled | 9/13/24: canceled per contractor |
09/13/2024 | RSBU - Building Progress | N/A | Canceled | 9/13/24: canceled per contractor |
09/13/2024 | COT - RSEL - Electrical Final | N/A | Canceled | 9/13/24: canceled per contractor |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01517
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/15/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
03/15/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
03/15/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
03/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
03/26/2024 | COT - RSBU - Preslab | Passed | ||
03/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/30/2024 | COT - RSBU - Roof Nailing | Passed | ||
04/30/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/28/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
05/28/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/03/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | per BO | |
07/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/26/2024 | COT - BULD - SWG Clearance | Passed | 8/26/24: SWG CLEARANCE METER TAG | |
09/12/2024 | ENGR Engineering Final | Passed | ||
09/18/2024 | COT - RSME - Mechanical Final | Passed | ||
09/18/2024 | RSBU - Building Final | Passed | ||
09/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
09/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/18/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/18/2024 | RSBU - Building Progress | Passed | ||
09/18/2024 | COT - RSEL - Electrical Final | Passed |