Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0923-01516
Permit Details
Apply Date:
12/17/2023
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - TC-MDP-0923-01516
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/26/2023 | APPROVED |
02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/01/2024 | APPROVED |
07/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01516
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
01/03/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/01/2024 | Post-Tension Inspection Report is required. | |
09/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/15/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01516
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/12/2024 | COT - RSPL - Yard Water Line | Passed | Main Water line is connected to water meter and under line pressure. Okay to shade pipe and backfill trench. | |
01/12/2024 | COT - RSPL - Sewer | Passed | Sewer line is connected to underground plumbing and main sewer line. Underground plumbing is under water test without any leaks. Backwater valve is installed between clean outs. Okay to shade piping and backfill trenches. | |
01/12/2024 | COT - RSPL - Rough Soil | Passed | Sewer line is connected to underground plumbing and main sewer line. Underground plumbing is under water test without any leaks. Backwater valve is installed between clean outs. Okay to shade piping and backfill trenches. | |
01/12/2024 | COT - RSPL - Backwater Valve | Passed | Sewer line is connected to underground plumbing and main sewer line. Underground plumbing is under water test without any leaks. Backwater valve is installed between clean outs. Okay to shade piping and backfill trenches. | |
01/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Ufer ground is in place, post tension cabling is installed and properly supported, rebar reinforcement is installed where required per plans, all plumbing pipes are properly protected with foam wrap or plastic boxes, and all shear wall clips are installed and properly supported. | |
01/17/2024 | COT - RSBU - Preslab | Passed | Ufer ground is in place, post tension cabling is installed and properly supported, rebar reinforcement is installed where required per plans, all plumbing pipes are properly protected with foam wrap or plastic boxes, and all shear wall clips are installed and properly supported. Okay to pour concrete slab and footings. | |
01/17/2024 | COT - RSEL - Electrical Underground | Passed | Electrical underground for kitchen island is in place. Okay to pour concrete slab. | |
01/17/2024 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is placed in footing. Okay to pour concrete. | |
02/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All exterior shear walls are properly installed and nailed off per plans. All shear wall clips and H2.5 clips are properly nailed off. Okay to dry-in exterior walls. | |
02/09/2024 | COT - RSBU - Roof Nailing | Passed | Roof TJI-Trusses are properly installed and nailed off. Okay to proceed with roofing material installation. | |
03/12/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
03/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
05/06/2024 | COT - RSBU - Interior Shear Bracing | Passed | 5/6/24: Drywall on interior shear walls is properly installed and screwed off per plans. Okay to proceed with tape, texture, and painting of ceilings and walls. | |
05/06/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Drywall is properly installed and secured to studs per plans for firewall on south wall of bedrooms and kitchen. | |
06/25/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
07/11/2024 | COT - RSEL - Electrical Final | Passed | ||
07/11/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
07/11/2024 | COT - RSME - Mechanical Final | Passed | ||
07/11/2024 | COT - RSPL - Plumbing Final | Passed | ||
07/11/2024 | RSBU - Building Final | Passed | ||
07/11/2024 | RSBU - Building Progress | Passed | ||
07/12/2024 | ENGR Engineering Final | Passed | It has been noted that the landing at the bottom of the steps for this unit is not ADA compliant. It exceeds more than 2% in the running slope. |