Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0923-01505
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
292 N SPRING FLOWER DR
Address NEW:
292 N SPRING FLOWER DR
Apply Date:
10/17/2023
Applicant:
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0923-01505
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/23/2023 | APPROVED |
| 03/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/20/2024 | APPROVED |
| 03/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/20/2024 | REQUIRES RESUBMIT |
| 09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01505
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 10/18/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/18/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/04/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01505
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2024 | COT - RSPL - Rough Soil | Passed | ||
| 02/01/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 02/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/13/2024 | COT - RSBU - Preslab | Passed | ||
| 02/13/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 02/13/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/20/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 02/20/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/12/2024 | BULD - Electrical Clearance | Passed | ||
| 03/12/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/12/2024 | RSBU - Building Progress | Passed | ||
| 03/22/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 03/22/2024 | COT - RSPL - Sewer | Passed | ||
| 03/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/07/2024 | COT - BULD - SWG Clearance | Passed | ||
| 05/24/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, AFCI & GFCI Breakers are installed in panel for all rooms, kitchen, bathrooms, garage and exterior outlets. Okay to issue Certificate of Occupancy once Fire & Engineering complete their inspections. | |
| 05/24/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, AFCI & GFCI Breakers are installed in panel for all rooms, kitchen, bathrooms, garage and exterior outlets. Okay to issue Certificate of Occupancy once Fire & Engineering complete their inspections. | |
| 05/24/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, AFCI & GFCI Breakers are installed in panel for all rooms, kitchen, bathrooms, garage and exterior outlets. Okay to issue Certificate of Occupancy once Fire & Engineering complete their inspections. | |
| 05/24/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, AFCI & GFCI Breakers are installed in panel for all rooms, kitchen, bathrooms, garage and exterior outlets. Okay to issue Certificate of Occupancy once Fire & Engineering complete their inspections. | |
| 05/24/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, AFCI & GFCI Breakers are installed in panel for all rooms, kitchen, bathrooms, garage and exterior outlets. Okay to issue Certificate of Occupancy once Fire & Engineering complete their inspections. | |
| 05/31/2024 | ENGR Engineering Final | Passed |