Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0923-01504
Permit Details
Apply Date:
10/17/2023
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0923-01504
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/17/2024 | APPROVED |
10/17/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/23/2023 | APPROVED |
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/22/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01504
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
10/17/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/17/2024 | Post-Tension Inspection Report is required. | |
10/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/04/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
04/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
04/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01504
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/19/2024 | RSBU - Building Progress | N/A | Not Applicable | |
04/19/2024 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | Gauge has less than one pound of pressure. |
04/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Obtain gas pressure test inspection approval. |
04/19/2024 | COT - RSME - Mechanical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01504
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2024 | COT - RSPL - Yard Water Line | Passed | ||
02/13/2024 | COT - RSPL - Rough Soil | Passed | ||
02/28/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
02/28/2024 | COT - RSBU - Preslab | Passed | ||
02/28/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
02/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
03/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
03/19/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/22/2024 | COT - RSPL - Sewer | Passed | ||
04/19/2024 | BULD - Electrical Clearance | Passed | ||
04/19/2024 | COT - RSPL - Backwater Valve | Passed | ||
04/22/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
04/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/06/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and screwed off per plan requirements. | |
06/12/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed in kitchen for range, laundry room for clothes dryer, and in garage for water heater. Okay to install meter. SWG Clearance given to Southwest Gas. | |
07/03/2024 | COT - RSME - Mechanical Final | Passed | All romex cabling used for circuit identification needs to removed from inside the electrical panel. | |
07/03/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and operational per plans. | |
07/03/2024 | COT - RSPL - Plumbing Final | Passed | ||
07/03/2024 | ENGR Engineering Final | Passed | ||
07/08/2024 | COT - RSEL - Electrical Final | Passed | ||
07/08/2024 | RSBU - Building Final | Passed |