Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/27/2023
Applicant:
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0923-01501
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
03/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2024 APPROVED Review Details
11/27/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/04/2023 APPROVED Review Details
10/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0923-01501
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
11/27/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/27/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/27/2023 Post-Tension Inspection Report is required.
09/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01501
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TRUSS DESIGN DRAWINGS_V1.PDF DOCUMENTS VIEW
145451 PT LOT 181 COMPLETE-2024-03-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 181 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 181 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 181 SPECIAL INSPECTION CERTIFICATE-2023-11-27_V1.PDF DOCUMENTS VIEW