Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0923-01500
Permit Details
Apply Date:
11/27/2023
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0923-01500
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/27/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/04/2023 | APPROVED |
03/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/20/2024 | APPROVED |
10/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01500
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
11/27/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
11/27/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
11/28/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
11/27/2023 | Post-Tension Inspection Report is required. | |
09/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
11/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01500
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2024 | COT - RSPL - Backwater Valve | N/A | Not Applicable | |
06/06/2024 | COT - RSEL - Electrical Final | N/A | Canceled | 6/6/24: canceled per contractor |
06/06/2024 | COT - RSPL - Plumbing Final | N/A | Canceled | 6/6/24: canceled per contractor |
06/06/2024 | RSBU - Building Final | N/A | Canceled | 6/6/24: canceled per contractor |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01500
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2024 | COT - RSPL - Rough Soil | Passed | ||
01/29/2024 | COT - RSPL - Yard Water Line | Passed | ||
02/07/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
02/07/2024 | COT - RSBU - Preslab | Passed | ||
02/07/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
02/07/2024 | COT - RSEL - Electrical Underground | Passed | ||
02/26/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses and sheathing are properly installed and nailed down. H2.5 clips are installed on every truss. Base plate is properly bolted down on shear walls and edge clips are installed and nailed off on base plates. Okay to dry in roof and walls. | |
02/26/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Roof trusses and sheathing are properly installed and nailed down. H2.5 clips are installed on every truss. Base plate is properly bolted down on shear walls and edge clips are installed and nailed off on base plates. Okay to dry in roof and walls. | |
03/14/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/14/2024 | BULD - Electrical Clearance | Passed | ||
03/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/15/2024 | COT - RSPL - Sewer | Passed | ||
04/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/13/2024 | COT - BULD - SWG Clearance | Passed | ||
06/04/2024 | COT - RSME - Mechanical Final | Passed | ||
06/04/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
06/04/2024 | RSBU - Building Progress | Passed | ||
06/06/2024 | ENGR Engineering Final | Passed | ||
06/10/2024 | COT - RSEL - Electrical Final | Passed | 6/10/24: Electrical panel has been properly labeled, post tension tag has been installed at front hose bib, construction debris has been removed from backyard. All construction work is complete, mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue Certificate of Occupancy for this permit. | |
06/10/2024 | COT - RSPL - Plumbing Final | Passed | 6/10/24: Electrical panel has been properly labeled, post tension tag has been installed at front hose bib, construction debris has been removed from backyard. All construction work is complete, mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue Certificate of Occupancy for this permit. | |
06/10/2024 | RSBU - Building Final | Passed | 6/10/24: Electrical panel has been properly labeled, post tension tag has been installed at front hose bib, construction debris has been removed from backyard. All construction work is complete, mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue Certificate of Occupancy for this permit. |