Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/27/2023
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0923-01500
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
11/27/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/04/2023 APPROVED Review Details
03/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2024 APPROVED Review Details
10/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0923-01500
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
11/27/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/27/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/27/2023 Post-Tension Inspection Report is required.
09/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01500
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
01/29/2024 COT - RSPL - Backwater Valve N/A Not Applicable
06/06/2024 COT - RSEL - Electrical Final N/A Canceled 6/6/24: canceled per contractor
06/06/2024 COT - RSPL - Plumbing Final N/A Canceled 6/6/24: canceled per contractor
06/06/2024 RSBU - Building Final N/A Canceled 6/6/24: canceled per contractor

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01500
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/29/2024 COT - RSPL - Rough Soil Passed
01/29/2024 COT - RSPL - Yard Water Line Passed
02/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/07/2024 COT - RSBU - Preslab Passed
02/07/2024 COT - RSEL - Grounding/Bonding Passed
02/07/2024 COT - RSEL - Electrical Underground Passed
02/26/2024 COT - RSBU - Roof Nailing Passed Roof trusses and sheathing are properly installed and nailed down. H2.5 clips are installed on every truss. Base plate is properly bolted down on shear walls and edge clips are installed and nailed off on base plates. Okay to dry in roof and walls.
02/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed Roof trusses and sheathing are properly installed and nailed down. H2.5 clips are installed on every truss. Base plate is properly bolted down on shear walls and edge clips are installed and nailed off on base plates. Okay to dry in roof and walls.
03/14/2024 COT - RSPL - Gas Pressure Test Passed
03/14/2024 BULD - Electrical Clearance Passed
03/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/15/2024 COT - RSPL - Sewer Passed
04/03/2024 COT - RSBU - Interior Shear Bracing Passed
05/13/2024 COT - BULD - SWG Clearance Passed
06/04/2024 COT - RSME - Mechanical Final Passed
06/04/2024 COT - RSEL - Outdoor Lighting Passed
06/04/2024 RSBU - Building Progress Passed
06/06/2024 ENGR Engineering Final Passed
06/10/2024 COT - RSEL - Electrical Final Passed 6/10/24: Electrical panel has been properly labeled, post tension tag has been installed at front hose bib, construction debris has been removed from backyard. All construction work is complete, mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue Certificate of Occupancy for this permit.
06/10/2024 COT - RSPL - Plumbing Final Passed 6/10/24: Electrical panel has been properly labeled, post tension tag has been installed at front hose bib, construction debris has been removed from backyard. All construction work is complete, mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue Certificate of Occupancy for this permit.
06/10/2024 RSBU - Building Final Passed 6/10/24: Electrical panel has been properly labeled, post tension tag has been installed at front hose bib, construction debris has been removed from backyard. All construction work is complete, mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue Certificate of Occupancy for this permit.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TRUSS DESIGN DRAWINGS_V1.PDF DOCUMENTS VIEW
145493 LOT 182 COMPLETE-2024-03-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 182 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 182 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 182 SPECIAL INSPECTION CERTIFICATE-2023-11-27_V1.PDF DOCUMENTS VIEW