Permit: TC-MDP-0923-01488
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6657 E CALLE ALEGRIA UNIT A
Address NEW:
6657 E CALLE ALEGRIA UNIT A
Apply Date:
09/05/2023
Applicant:
Andrew Christopher
Description:
MCA
Permit Reviews
Permit Number - TC-MDP-0923-01488
Permit Status: Complete
Permit Description: MCA
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/22/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 09/26/2023 | APPROVED |
| 01/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/17/2025 | APPROVED |
| 09/06/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/07/2023 | REQUIRES RESUBMIT |
| 12/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/14/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01488
Permit Status: Complete
Permit Description: MCA
| Date | Description | Comments |
|---|---|---|
| 01/17/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/06/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/17/2025 | Post-Installed Anchor Inspection Report is required. | |
| 01/17/2025 | Post-Tension Inspection Report is required. | |
| 06/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/17/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01488
Permite Description: MCA
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2024 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 04/03/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | Site does not use gas |
| 04/03/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01488
Permit Description: MCA
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2024 | COT - RSPL - Rough Soil | Passed | ||
| 06/18/2024 | COT - RSPL - Sewer | Passed | ||
| 06/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/25/2024 | COT - RSBU - Preslab | Passed | ||
| 06/25/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/03/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | not yet | |
| 10/29/2024 | RSBU - Building Progress | Passed | ok to drywall | |
| 11/15/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly secured to the studs per plan requirements. Okay to proceed with tape, texture, and paint of all walls and ceilings. | |
| 12/18/2024 | BULD - Electrical Clearance | Passed | ECO | |
| 04/03/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/3/25 CLEARANCE ECO | |
| 04/03/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/3/25 | |
| 04/03/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/3/25 | |
| 04/03/2025 | COT - RSPL - Backwater Valve | Passed | Checked at plumbing underground | |
| 04/03/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/3/25 | |
| 04/03/2025 | RSBU - Building Final | Passed | Passed final 4/3/25 | |
| 05/01/2025 | ENGR Engineering Final | Passed |