Permit: TC-MDP-0923-01485
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6665 E CALLE ALEGRIA UNIT B
Address NEW:
6665 E CALLE ALEGRIA UNIT B
Apply Date:
09/05/2023
Applicant:
Chelsea Marshall
Description:
MCA
Permit Reviews
Permit Number - TC-MDP-0923-01485
Permit Status: Complete
Permit Description: MCA
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/01/2023 | APPROVED |
| 09/22/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 09/26/2023 | APPROVED |
| 01/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/17/2025 | APPROVED |
| 09/06/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/07/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0923-01485
Permit Status: Complete
Permit Description: MCA
| Date | Description | Comments |
|---|---|---|
| 01/17/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/06/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/17/2025 | Post-Installed Anchor Inspection Report is required. | |
| 01/17/2025 | Post-Tension Inspection Report is required. | |
| 06/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/17/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01485
Permite Description: MCA
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2024 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 09/20/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 04/03/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | Site does not use gas |
| 04/03/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01485
Permit Description: MCA
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/16/2024 | COT - RSPL - Sewer | Passed | ||
| 05/16/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 09/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/18/2024 | BULD - Electrical Clearance | Passed | ECO | |
| 04/03/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/3/25 CLEARANCE ECO | |
| 04/03/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/3/25 | |
| 04/03/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/3/25 | |
| 04/03/2025 | COT - RSPL - Backwater Valve | Passed | checked at plumbing underground | |
| 04/03/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/3/25 | |
| 04/03/2025 | RSBU - Building Final | Passed | Passed final 4/3/25 | |
| 05/01/2025 | ENGR Engineering Final | Passed |