Permit: TC-MDP-0923-01480
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6689 E CALLE ALEGRIA UNIT A
Address NEW:
6689 E CALLE ALEGRIA UNIT A
Apply Date:
09/05/2023
Applicant:
Chelsea Marshall
Description:
MCA
Permit Reviews
Permit Number - TC-MDP-0923-01480
Permit Status: Complete
Permit Description: MCA
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/06/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/07/2023 | REQUIRES RESUBMIT |
| 01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/15/2025 | APPROVED |
| 07/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2024 | APPROVED |
| 11/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/03/2023 | APPROVED |
| 09/21/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 09/26/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01480
Permit Status: Complete
Permit Description: MCA
| Date | Description | Comments |
|---|---|---|
| 07/06/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/15/2025 | Post-Installed Anchor Inspection Report is required. | |
| 01/15/2025 | Post-Tension Inspection Report is required. | |
| 06/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/15/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01480
Permite Description: MCA
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2024 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 02/06/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/06/2025 | COT - RSPL - Backwater Valve | N/A | Not Applicable | |
| 02/06/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 03/10/2025 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01480
Permit Description: MCA
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2024 | COT - RSPL - Sewer | Passed | ||
| 05/15/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 05/24/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
| 08/06/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/06/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 08/19/2024 | COT - RSPL - Yard Water Line | Passed | Yard line from meter to house ok to backfill. | |
| 08/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/16/2024 | BULD - Electrical Clearance | Passed | ||
| 02/06/2025 | COT - RSEL - Electrical Final | Passed | ||
| 02/06/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 02/10/2025 | COT - RSME - Mechanical Final | Passed | ||
| 02/06/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 02/06/2025 | RSBU - Building Final | Passed | ||
| 03/10/2025 | ENGR Engineering Final | Passed |