Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0923-01477
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12850 E TORTOISE POINTE DR
Address NEW:
12850 E TORTOISE POINTE DR
Apply Date:
03/22/2024
Applicant:
Description:
SFR RKF55C T21-M0085
Permit Reviews
Permit Number - TC-MDP-0923-01477
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0923-01477
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/25/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 03/25/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 03/25/2024 | Post-Tension Inspection Report is required. |
| 03/25/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0923-01477
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
| Date | Description | Comments |
|---|---|---|
| 09/01/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/22/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 08/08/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01477
Permite Description: SFR RKF55C T21-M0085
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 7/15/24: cut nail needed at bedroom 2 walk in closet. Trust t40 in garage needs engineering fix for broken/cracked webbing. |
| 07/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 7/15/24: cut nail needed at bedroom 2 walk in closet. Trust t40 in garage needs engineering fix for broken/cracked webbing. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01477
Permit Description: SFR RKF55C T21-M0085
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 05/20/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/20/2024 | COT - RSPL - Sewer | Passed | ||
| 05/20/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/30/2024 | COT - RSBU - Preslab | Passed | ||
| 05/30/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 05/30/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/30/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/22/2024 | COT - RSBU - Roof Nailing | Passed | 7/22/24: Bottom plate in Bedroom #2 has been secured to concrete floor. Truss webbing on truss T40 in garage has been reinforced on both sides per engineered specifications. Okay to proceed with rough-in of mechanical, plumbing, and electrical. | |
| 07/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 7/22/24: Bottom plate in Bedroom #2 has been secured to concrete floor. Truss webbing on truss T40 in garage has been reinforced on both sides per engineered specifications. Okay to proceed with rough-in of mechanical, plumbing, and electrical. | |
| 08/21/2024 | COT - RSPL - Gas Pressure Test | Passed | Temporary GFCI receptacles and breakers missing at panel. Bonding wire from meter to gas line missing. | |
| 08/23/2024 | BULD - Electrical Clearance | Passed | 8/23/24: Electricians have installed bonding wire on gas line, temp power receptacle, and breakers on panel box. Okay to proceed with insulation and drywall installation throughout building. | |
| 08/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/23/24: Electricians have installed bonding wire on gas line, temp power receptacle, and breakers on panel box. Okay to proceed with insulation and drywall installation throughout building. | |
| 09/11/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly secured to studs per shear wall detail on plan. Okay to proceed with tape, texture, and paint. | |
| 11/01/2024 | COT - BULD - SWG Clearance | Passed | 11-1-24, approved for Southwest Gas connection. | |
| 11/15/2024 | COT - RSEL - Electrical Final | Passed | 11-15-24, electrical final approved. | |
| 11/15/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-15-24, electrical final approved. | |
| 11/15/2024 | COT - RSME - Mechanical Final | Passed | 11-15-24, mechanical final approved. | |
| 11/15/2024 | COT - RSPL - Plumbing Final | Passed | 11-15-24, mechanical final approved. | |
| 11/15/2024 | RSBU - Building Progress | Passed | ||
| 11/19/2024 | RSBU - Building Final | Passed | 11-19-24, building final approved | |
| 11/21/2024 | ENGR Engineering Final | Passed |