Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/26/2024
Applicant:
Description:
SFR RKF55C T21-M0085

Permit Reviews

Permit Number - TC-MDP-0923-01476
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Start Date Submittal Complete Date Status  
09/09/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/17/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0923-01476
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Total Outstanding Activity Conditions - 6
Date Name
08/08/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/17/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/17/2024 Post-Tension Inspection Report is required.
09/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0923-01476
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Date Description Comments
09/01/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01476
Permite Description: SFR RKF55C T21-M0085
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/05/2025 COT - BULD - SWG Clearance N/A Re-inspection required Missing shut off valve at oven

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01476
Permit Description: SFR RKF55C T21-M0085
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/30/2024 COT - RSPL - Yard Water Line Passed Water line is connected to main water supply with a meter. Water line is under street pressure test with no leaks. Okay to shade pipe and backfill trench.
09/30/2024 COT - RSPL - Sewer Passed Underground plumbing is complete and connected to backwater valve and main sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
09/30/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete and connected to backwater valve and main sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
09/30/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is complete and connected to backwater valve and main sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
10/08/2024 COT - RSEL - Electrical Underground Passed
10/08/2024 COT - RSEL - Grounding/Bonding Passed
10/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 10/9/24: Plumbing pipe has been repaired and area re-compacted. All underground pipes are properly wrapped. Okay to pour concrete.
10/09/2024 COT - RSBU - Preslab Passed 10/9/24: Plumbing pipe has been repaired and area re-compacted. All underground pipes are properly wrapped. Okay to pour concrete.
11/05/2024 COT - RSBU - Roof Nailing Passed 11-5-24, exterior clip/sheathing and roof nailing approved. Okay to continue construction per approved plans.
11/05/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-5-24, exterior clip/sheathing and roof nailing approved. Okay to continue construction per approved plans.
12/16/2024 COT - RSPL - Gas Pressure Test Passed 12-16-24, gas pressure test verified at 15psi.
12/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-19-24, residential intermediate approved.
12/19/2024 BULD - Electrical Clearance Passed 12-19-24, ECO clearance issued to TEP
01/07/2025 COT - RSBU - Interior Shear Bracing Passed Nailing per plan, ok to tape 1/7/25
03/05/2025 COT - BULD - SWG Clearance Passed PASSED 3/5/25 CLEARANCE SWG
03/19/2025 COT - RSEL - Electrical Final Passed Passed 3/19/25 CLEARANCE ECO
03/19/2025 COT - RSEL - Outdoor Lighting Passed Passed final 3/19/25
03/19/2025 COT - RSME - Mechanical Final Passed Passed final 3/19/25
03/19/2025 COT - RSPL - Plumbing Final Passed Passed final 3/19/25
03/19/2025 ENGR Engineering Final Passed CO Ready
03/19/2025 RSBU - Building Final Passed Passed final 3/19/25
03/19/2025 RSBU - Building Progress Passed Passed final 3/19/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW