Permit: TC-MDP-0923-01476
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12892 E TORTOISE POINTE DR
Address NEW:
12892 E TORTOISE POINTE DR
Apply Date:
08/26/2024
Applicant:
Description:
SFR RKF55C T21-M0085
Permit Reviews
Permit Number - TC-MDP-0923-01476
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/17/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0923-01476
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/08/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 09/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/17/2024 | Post-Tension Inspection Report is required. |
| 09/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0923-01476
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
| Date | Description | Comments |
|---|---|---|
| 09/01/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01476
Permite Description: SFR RKF55C T21-M0085
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2025 | COT - BULD - SWG Clearance | N/A | Re-inspection required | Missing shut off valve at oven |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0923-01476
Permit Description: SFR RKF55C T21-M0085
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2024 | COT - RSPL - Yard Water Line | Passed | Water line is connected to main water supply with a meter. Water line is under street pressure test with no leaks. Okay to shade pipe and backfill trench. | |
| 09/30/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and connected to backwater valve and main sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 09/30/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and connected to backwater valve and main sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 09/30/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is complete and connected to backwater valve and main sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 10/08/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/08/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/9/24: Plumbing pipe has been repaired and area re-compacted. All underground pipes are properly wrapped. Okay to pour concrete. | |
| 10/09/2024 | COT - RSBU - Preslab | Passed | 10/9/24: Plumbing pipe has been repaired and area re-compacted. All underground pipes are properly wrapped. Okay to pour concrete. | |
| 11/05/2024 | COT - RSBU - Roof Nailing | Passed | 11-5-24, exterior clip/sheathing and roof nailing approved. Okay to continue construction per approved plans. | |
| 11/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-5-24, exterior clip/sheathing and roof nailing approved. Okay to continue construction per approved plans. | |
| 12/16/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-16-24, gas pressure test verified at 15psi. | |
| 12/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12-19-24, residential intermediate approved. | |
| 12/19/2024 | BULD - Electrical Clearance | Passed | 12-19-24, ECO clearance issued to TEP | |
| 01/07/2025 | COT - RSBU - Interior Shear Bracing | Passed | Nailing per plan, ok to tape 1/7/25 | |
| 03/05/2025 | COT - BULD - SWG Clearance | Passed | PASSED 3/5/25 CLEARANCE SWG | |
| 03/19/2025 | COT - RSEL - Electrical Final | Passed | Passed 3/19/25 CLEARANCE ECO | |
| 03/19/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 3/19/25 | |
| 03/19/2025 | COT - RSME - Mechanical Final | Passed | Passed final 3/19/25 | |
| 03/19/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 3/19/25 | |
| 03/19/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/19/2025 | RSBU - Building Final | Passed | Passed final 3/19/25 | |
| 03/19/2025 | RSBU - Building Progress | Passed | Passed final 3/19/25 |