Permit: TC-MDP-0825-00482
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
7512 S BULLSEYE WY
Address NEW:
7512 S BULLSEYE WY
Apply Date:
09/15/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
Permit Reviews
Permit Number - TC-MDP-0825-00482
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0825-00482
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 08/28/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 09/17/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/17/2025 | Post-Installed Anchor Inspection Report is required. |
| 09/17/2025 | Post-Tension Inspection Report is required. |
| 09/17/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0825-00482
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
| Date | Description | Comments |
|---|---|---|
| 08/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0825-00482
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2025 | COT - RSPL - Rough Soil | Passed | 10.20.2025 Approved per plan and holding under test, okay to backfill with shading materials. |
|
| 10/20/2025 | COT - RSPL - Sewer | Passed | ||
| 10/20/2025 | COT - RSPL - Yard Water Line | Passed | 10.20.2025 Approved per plan and holding under test, okay to backfill with shading materials. |
|
| 10/27/2025 | BULD - Electrical Clearance | Passed | 10.27.2025 Clearance TEP ECO. |
|
| 10/27/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10.27.2025 Approved per plan. |
|
| 10/27/2025 | COT - RSBU - Preslab | Passed | 10.27.2025 Approved, ok for concrete placement. |
|
| 10/27/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 10/27/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11.06.2025 Approved per plan. |
|
| 11/06/2025 | COT - RSBU - Roof Nailing | Passed | 11.06.2025 Approved per plan. |
|
| 11/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11.24.2025 Approved per plan, repaired ripped duct in garage and fire foamed penetrations. |
|
| 11/24/2025 | COT - RSPL - Gas Pressure Test | Passed | 11.24.2025 Approved and holding under test. |
|
| 12/04/2025 | COT - RSBU - Interior Shear Bracing | Passed | 12.4.25 Approved |
|
| 01/21/2026 | COT - BULD - SWG Clearance | Passed | 01/21/2026 Clearance Southwest Gas. |
|
| 01/28/2026 | COT - RSEL - Electrical Final | Passed | ||
| 01/28/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/28/2026 | COT - RSME - Mechanical Final | Passed | ||
| 01/28/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 01/28/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 01/28/2026 | RSBU - Building Final | Passed | ||
| 01/28/2026 | RSBU - Building Progress | Passed |