Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7488 S BULLSEYE WY
Apply Date:
03/13/2026
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2

Permit Reviews

Permit Number - TC-MDP-0825-00480
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
Start Date Submittal Complete Date Status  
03/16/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/27/2026 APPROVED Review Details
07/24/2026 SPECIAL INSPECTION REVIEW v.1 07/27/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0825-00480
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
Date Description Comments
03/18/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/18/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/28/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/18/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0825-00480
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415) Rev 2
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/20/2026 COT - RSPL - Rough Soil Passed 04/20/2026
Holding under test. Okay to backfill, shading required.
04/20/2026 COT - RSPL - Sewer Passed 04/20/2026
Holding under test. Okay to backfill, shading required.
04/20/2026 COT - RSPL - Yard Water Line Passed 04/20/2026
Holding under test. Okay to backfill, shading required.
04/23/2026 BULD - Electrical Clearance Passed 04/23/2026
Clearance TEP ECO.
04/23/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 04/23/2026
Approved per plan and reinforcement. Okay to pour.
04/23/2026 COT - RSBU - Preslab Passed 04/23/2026
Approved per plan and reinforcement. Okay to pour.
04/23/2026 COT - RSEL - Electrical Underground Passed
04/23/2026 COT - RSEL - Grounding/Bonding Passed 04/23/2026
Tied into MSP with ground rods and Ufer.
05/05/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5.5.26
Approved - proceed
05/05/2026 COT - RSBU - Roof Nailing Passed
05/21/2026 COT - RSPL - Gas Pressure Test Passed Passed 5/21/26
05/21/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 5/21/26
06/08/2026 COT - RSBU - Interior Shear Bracing Passed
07/16/2026 COT - BULD - SWG Clearance Passed 7/16/2026
Approved clearance for Southwest Gas.
07/29/2026 COT - RSEL - Electrical Final Passed
07/29/2026 COT - RSEL - Outdoor Lighting Passed
07/29/2026 COT - RSME - Mechanical Final Passed
07/29/2026 COT - RSPL - Plumbing Final Passed
07/29/2026 ENGR Engineering Final Passed
07/29/2026 RSBU - Building Final Passed
07/29/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
2_SPECIAL INSPECTION CERT_DOUBLE STAMP-2026-07-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2026-03-13_V1.PDF DOCUMENTS VIEW