Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
9763 E PANOPEIA DR
Apply Date:
04/07/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408TC-MDP-0725-00408)

Permit Reviews

Permit Number - TC-MDP-0825-00467
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408TC-MDP-0725-00408)
Start Date Submittal Complete Date Status  
08/28/2026 SPECIAL INSPECTION REVIEW v.1 09/02/2026 APPROVED Review Details
05/04/2026 ADMINISTRATIVE v.2 N/A APPROVED Review Details
04/10/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/21/2026 REQUIRES RESUBMIT Review Details
04/24/2026 ADMINISTRATIVE v.1 04/24/2026 REQUIRES RESUBMIT Review Details
04/24/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.2 04/24/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0825-00467
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408TC-MDP-0725-00408)
Date Description Comments
08/20/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
04/15/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/20/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/20/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/15/2026 Post-Installed Anchor Inspection Report is required.
08/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/20/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
04/15/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0825-00467
Permite Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408TC-MDP-0725-00408)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/17/2026 COT - RSPL - Gas Pressure Test N/A Re-inspection required 8-17-26: no history of a gas pressure test at intermediates. Per previous inspection, gas pressure test failed. Set gauge to 15psi and reschedule an inspection.
08/21/2026 ENGR Engineering Final N/A Partial Pass Site is complete in accordance with approved plans.
Outstanding conditions need to be satisfied.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0825-00467
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408TC-MDP-0725-00408)
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/06/2026 COT - RSPL - Yard Water Line Passed Verified via air test
05/06/2026 COT - RSPL - Rough Soil Passed
05/06/2026 COT - RSPL - Backwater Valve Passed
05/12/2026 COT - RSBU - Excavation/Rebar/Zoning Passed
05/12/2026 COT - RSBU - Preslab Passed 5.12.26
approved
05/12/2026 COT - RSEL - Electrical Underground Passed
05/27/2026 COT - RSPL - Sewer Passed 5.27.26
Approved
05/27/2026 COT - RSBU - Roof Nailing Passed
05/29/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5-29-26: corrections made-Exterior clip/framing approved. Okay to continue with construction at progress areas.
06/12/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/12/2026 BULD - Electrical Clearance Passed
07/02/2026 COT - RSBU - Interior Shear Bracing Passed 07/02/2026
Corrections made to drywall screw spacing.
08/17/2026 COT - RSPL - Gas Pressure Test Passed 8-17-26: gas pressure test verified at 15psi for a minimum of 10 minutes.
08/20/2026 COT - BULD - SWG Clearance Passed 8-20-26 SWG clearance approved
08/20/2026 COT - RSEL - Grounding/Bonding Passed 8-20-26 Uffer has been added
08/21/2026 COT - RSEL - Electrical Final Passed
08/21/2026 COT - RSEL - Outdoor Lighting Passed
08/21/2026 COT - RSME - Mechanical Final Passed
08/21/2026 COT - RSPL - Plumbing Final Passed
08/21/2026 RSBU - Building Final Passed
08/21/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
PT PACKET- MRB 37-2026-08-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 37 START_V1.PDF DOCUMENTS VIEW
MRB 37 SIC-2026-04-07_V1.PDF DOCUMENTS VIEW