Permit: TC-MDP-0825-00444
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1315 W SPEEDWAY BL UNIT 1
Address NEW:
1315 W SPEEDWAY BL UNIT 1
Apply Date:
10/31/2025
Applicant:
Brandon Matheson
Description:
Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
Permit Reviews
Permit Number - TC-MDP-0825-00444
Permit Status: Complete
Permit Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/20/2026 | ADMINISTRATIVE v.1 | 01/20/2026 | APPROVED |
| 01/02/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 01/13/2026 | APPROVED |
| 01/29/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/29/2026 | APPROVED |
| 10/31/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/13/2025 | REQUIRES RESUBMIT |
| 01/13/2026 | ADMINISTRATIVE v.1 | 01/13/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0825-00444
Permit Status: Complete
Permit Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
| Date | Description | Comments |
|---|---|---|
| 08/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/15/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0825-00444
Permite Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/29/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0825-00444
Permit Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | COT - RSPL - Rough Soil | Passed | ||
| 03/19/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/19/2026 Corrections made to prior inspection. Ok for concrete placement. |
|
| 03/19/2026 | COT - RSBU - Preslab | Passed | 3/19/2026 Corrections made to prior inspection. Ok for concrete placement. |
|
| 04/13/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4.13.26 Approved |
|
| 04/13/2026 | COT - RSBU - Roof Nailing | Passed | 4.13.26 Approved |
|
| 05/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 05/07/2026 Verified gray water, added blocking to air registers and bracing to DWV and water lines. |
|
| 05/11/2026 | BULD - Electrical Clearance | Passed | 05/11/2026 Clearance TEP ECO. |
|
| 05/11/2026 | COT - RSPL - Yard Water Line | Passed | 05/11/2026 Holding under test. Okay to backfill, shading required. |
|
| 05/15/2026 | COT - RSPL - Sewer | Passed | Passed 5/15/26 | |
| 05/15/2026 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/15/26 | |
| 05/29/2026 | COT - RSEL - Grounding/Bonding | Passed | 05/29/2026 Verified tie into main service panel. |
|
| 05/29/2026 | RSBU - Building Progress | Passed | ||
| 06/26/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 06/26/2026 | ENGR Engineering Final | Passed | ||
| 07/01/2026 | COT - RSEL - Electrical Final | Passed | ||
| 07/01/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/01/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/01/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/01/2026 | RSBU - Building Final | Passed | Approved. Corrections were made. No new additional items were added. 7/1/2026 |