Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
5934 E BENBURB LN
Apply Date:
10/17/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2

Permit Reviews

Permit Number - TC-MDP-0825-00437
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Start Date Submittal Complete Date Status  
10/20/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0825-00437
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Total Outstanding Activity Conditions - 5
Date Name
08/15/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/15/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/20/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/20/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/20/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0825-00437
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Date Description Comments
08/15/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/15/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/23/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0825-00437
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413) Rev 2
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/24/2025 COT - RSPL - Backwater Valve Passed 11.24.2025
Approved and holding under test with green tracer - okay to backfill.
11/24/2025 COT - RSPL - Rough Soil Passed 11.24.2025
Approved and all fixtures holding under test - okay to backfill.
11/24/2025 COT - RSPL - Sewer Passed 11.24.2025
Approved and holding under test - okay to backfill.
11/24/2025 COT - RSPL - Yard Water Line Passed 11.24.2025
Approved and holding under test with blue tracer to meter - okay to backfill.
12/03/2025 BULD - Electrical Clearance Passed 12.3.25
Approved
12/03/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 12.3.25
Approved
12/03/2025 COT - RSBU - Preslab Passed
12/03/2025 COT - RSEL - Electrical Underground Passed 12.3.25
Approved
12/03/2025 COT - RSEL - Grounding/Bonding Passed 12.3.25
Approved
12/12/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12.12.25
Approved
12/12/2025 COT - RSBU - Roof Nailing Passed 12.12.25
Approved
12/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/23/2025
Approved. Verified added fire foam at penetrations on east wall of master bedroom and nail plate on DWV.
12/23/2025 COT - RSPL - Gas Pressure Test Passed 12/23/2025
Approved and holding under test.
01/06/2026 COT - RSBU - Interior Shear Bracing Passed
02/10/2026 COT - BULD - SWG Clearance Passed 02/10/2026
Clearance Southwest Gas.
02/25/2026 RSBU - Building Progress Passed
02/25/2026 COT - RSEL - Electrical Final Passed
02/25/2026 COT - RSEL - Outdoor Lighting Passed
02/25/2026 COT - RSME - Mechanical Final Passed
02/25/2026 COT - RSPL - Plumbing Final Passed
02/25/2026 ENGR Engineering Final Passed
02/25/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-10-17_V1.PDF DOCUMENTS VIEW