Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
9575 E FRIEDEL DR
Apply Date:
08/12/2025
Applicant:
Joshua Swinney
Description:
SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132) Rev 3

Permit Reviews

Permit Number - TC-MDP-0825-00429
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132) Rev 3
Start Date Submittal Complete Date Status  
05/21/2026 SPECIAL INSPECTION REVIEW v.1 05/26/2026 APPROVED Review Details
09/19/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/30/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0825-00429
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132) Rev 3
Date Description Comments
08/13/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/22/2025 Post-Installed Anchor Inspection Report is required.
09/22/2025 Post-Tension Inspection Report is required.
08/13/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/13/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/22/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0825-00429
Permite Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132) Rev 3
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/05/2025 COT - BULD - SWG Clearance N/A Not Applicable
11/05/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
11/12/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 11.12.2025
Ufer only.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0825-00429
Permit Description: SFR 500 Coolidge Model Plan La Escalera (Model master plan TC-MDP-1222-00132) Rev 3
Total Completed Inspections - 19
Date Description Inspector Results Comments
11/05/2025 COT - RSPL - Rough Soil Passed 11.05.2025
Approved and all DWV fixtures under test at depth - ok to backfill with shading materials.
11/05/2025 COT - RSPL - Sewer Passed 11.05.2025
Approved and under test at depth with green tracer wire to HCS - ok to backfill with shading materials.
11/05/2025 COT - RSPL - Yard Water Line Passed 11.05.2025
Approved and under test at depth with blue tracer wire to meter - ok to backfill with shading materials.
11/12/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
11/12/2025 COT - RSEL - Electrical Underground Passed
11/13/2025 COT - RSBU - Preslab Passed 11/13/25 corrections made
12/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12.1.25
Approved
12/01/2025 COT - RSBU - Roof Nailing Passed 12.1.25
Approved
01/13/2026 BULD - Electrical Clearance Passed ECO
TEP
01/13/2026 COT - RSEL - Grounding/Bonding Passed
02/03/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/3/2026 all corrections were made.
02/17/2026 COT - RSBU - Interior Shear Bracing Passed 2.17.26
Approved
05/21/2026 COT - RSEL - Electrical Final Passed Passed 5/21/26
05/21/2026 COT - RSEL - Outdoor Lighting Passed Passed 5/21/26
05/21/2026 COT - RSME - Mechanical Final Passed Passed 5/21/26
05/21/2026 COT - RSPL - Plumbing Final Passed Passed 5/21/26
05/21/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
05/21/2026 RSBU - Building Final Passed Passed 5/21/26
05/21/2026 RSBU - Building Progress Passed Passed 5/21/26

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
LOT 114 SIC-2026-05-14_V1.PDF DOCUMENTS VIEW
USE - PATTISON SOILS REPORT 1.25.2022_V1.PDF DOCUMENTS VIEW
Z500- COOLIDGE TRUSS CALCS R1 STAMPED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESCALERA (MIRADOR) LOT 114_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 114 SIC-2025-09-19_V1.PDF DOCUMENTS VIEW