Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/29/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA3X2 T20-M0046

Permit Reviews

Permit Number - TC-MDP-0824-00975
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
Start Date Submittal Complete Date Status  
05/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2025 APPROVED Review Details
09/10/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/17/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0824-00975
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
Date Description Comments
09/10/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
09/17/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/17/2024 Post-Tension Inspection Report is required.
08/29/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00975
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/08/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
12/04/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00975
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/08/2024 COT - RSPL - Yard Water Line Passed
10/08/2024 COT - RSPL - Sewer Passed
10/08/2024 COT - RSPL - Rough Soil Passed
12/04/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
12/04/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/04/2024 COT - RSBU - Roof Nailing Passed
12/04/2024 COT - RSBU - Preslab Passed
12/04/2024 COT - RSEL - Electrical Underground Passed
12/18/2024 COT - BULD - SWG Clearance Passed
12/18/2024 BULD - Electrical Clearance Passed ECO
12/18/2024 COT - RSEL - Grounding/Bonding Passed
01/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1-22-25, residential intermediate inspection approved. Okay to continue with construction.
02/07/2025 COT - RSBU - Interior Shear Bracing Passed with corrections.
05/20/2025 COT - RSEL - Electrical Final Passed
05/20/2025 COT - RSEL - Outdoor Lighting Passed
05/20/2025 COT - RSME - Mechanical Final Passed
05/20/2025 COT - RSPL - Plumbing Final Passed
05/20/2025 RSBU - Building Final Passed
05/21/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COMPLETE PT REPORT BLDG 188-2025-05-13_V1.PDF DOCUMENTS VIEW
SIC BLDG 188-2024-08-29_V1.PDF DOCUMENTS VIEW
SITE PLAN BLDG 188_V1.PDF DOCUMENTS VIEW
SOILS TESTING BLDG 188_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ELECTRICAL CONNECTIONS BLDG 188_V1.PDF DOCUMENTS VIEW
SEWER CONNECTION PERMIT BLDGS 186-194_V1.PDF DOCUMENTS VIEW
SIC BLDG 188-2024-08-29_V1.PDF DOCUMENTS VIEW
SITE PLAN BLDG 188_V1.PDF DOCUMENTS VIEW