Permit: TC-MDP-0824-00973
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 191
Address NEW:
9125 E CATALINA HY BLDG 191
Apply Date:
08/29/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA3X2 T20-M0046
Permit Reviews
Permit Number - TC-MDP-0824-00973
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/17/2024 | APPROVED |
| 06/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/03/2025 | APPROVED |
| 05/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0824-00973
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Date | Description | Comments |
|---|---|---|
| 09/10/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/17/2024 | Post-Tension Inspection Report is required. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00973
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 1-9-25, not applicable |
| 01/16/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 1-16-25, not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00973
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2025 | COT - RSPL - Rough Soil | Passed | ||
| 01/02/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 01/02/2025 | COT - RSPL - Sewer | Passed | ||
| 01/09/2025 | COT - RSBU - Preslab | Passed | 1-9-25, not ready, contractor will reschedule. | |
| 01/09/2025 | COT - RSEL - Electrical Underground | Passed | 1-9-25, electrical underground approved. | |
| 01/09/2025 | RSBU - Building Progress | Passed | ||
| 01/16/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-16-25, approved on the 1-9-25 | |
| 02/03/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with top out of plumbing and mechanical, electrical rough in. | |
| 02/03/2025 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with top out of plumbing and mechanical, electrical rough in. | |
| 02/10/2025 | BULD - Electrical Clearance | Passed | 2/10/25: TEP ECO Clearance issued for 9125 E. Catalina Hwy. Bldg. 191 | |
| 02/10/2025 | COT - RSEL - Grounding/Bonding | Passed | Ground wire properly connected to Ufer ground. | |
| 03/19/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3-19-25, approved. Okay to continue construction. | |
| 04/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Shear wall and screws per schedule, ok to tape | |
| 05/22/2025 | ENGR Engineering Final | Passed | ||
| 06/12/2025 | COT - RSEL - Electrical Final | Passed | Passed 6/12/25 | |
| 06/12/2025 | COT - RSEL - Outdoor Lighting | Passed | Ready for temp power CLEARANCE ECO | |
| 06/12/2025 | COT - RSME - Mechanical Final | Passed | Ready for temp power CLEARANCE ECO | |
| 06/12/2025 | COT - RSPL - Plumbing Final | Passed | Ready for temp power CLEARANCE ECO | |
| 06/12/2025 | RSBU - Building Final | Passed | Passed 6/12/25 |