Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0824-00972
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 129
Address NEW:
9125 E CATALINA HY BLDG 129
Apply Date:
09/12/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA3X2 T20-M0046
Permit Reviews
Permit Number - TC-MDP-0824-00972
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/22/2025 | REQUIRES RESUBMIT |
| 09/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/24/2024 | APPROVED |
| 07/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/23/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00972
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Date | Description | Comments |
|---|---|---|
| 09/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/19/2024 | Post-Tension Inspection Report is required. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00972
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 12/05/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 01/16/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 1-16-25, not applicable. |
| 01/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 1-16-25, tighten anchor bolts on west side and add anchor bolt on northwest corner. Add rsp4's to marked areas. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00972
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2024 | COT - RSPL - Sewer | Passed | ||
| 11/25/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 11/25/2024 | COT - RSPL - Rough Soil | Passed | ||
| 12/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/05/2024 | COT - RSBU - Preslab | Passed | ||
| 12/05/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 12/05/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 01/16/2025 | COT - RSBU - Roof Nailing | Passed | 1-16-25, roof nailing approved. Okay to continue with construction. | |
| 01/17/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/17/25: Contractor has tightened anchor bolts in sole plate, added redheads at joints in sole plate, and installed RSP4 clips at missing locations. | |
| 02/24/2025 | BULD - Electrical Clearance | Passed | Passed 2/24/25 ready for temp power | |
| 03/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ready for temp power CLEARANCE ECO | |
| 03/24/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 06/13/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/13/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/13/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/13/2025 | RSBU - Building Final | Passed | ||
| 07/28/2025 | ENGR Engineering Final | Passed |