Permit: TC-MDP-0824-00970
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 138
Address NEW:
9125 E CATALINA HY BLDG 138
Apply Date:
09/12/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA3X2 T20-M0046
Permit Reviews
Permit Number - TC-MDP-0824-00970
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/23/2025 | APPROVED |
| 07/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/18/2025 | REQUIRES RESUBMIT |
| 05/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2025 | APPROVED |
| 09/18/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/24/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00970
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Date | Description | Comments |
|---|---|---|
| 09/18/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/19/2024 | Post-Tension Inspection Report is required. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00970
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 2-18-25, not applicable |
| 02/18/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 2-18-25, not applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00970
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | COT - RSPL - Rough Soil | Passed | 2-18-25, underground plumbing approved plans. 0kay to backfill with shading. | |
| 02/18/2025 | COT - RSPL - Sewer | Passed | 2-18-25, main water line, HCS connection,underground plumbing approved plans. 0kay to backfill with shading. | |
| 02/18/2025 | COT - RSPL - Yard Water Line | Passed | 2-18-25, main water line, HCS connection,underground plumbing approved plans. 0kay to backfill with shading. | |
| 02/18/2025 | RSBU - Building Progress | Passed | ||
| 02/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/25/2025 | COT - RSBU - Preslab | Passed | ||
| 02/25/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 03/18/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/18/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/24/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 04/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/24/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/09/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/9/25 | |
| 08/13/2025 | COT - RSME - Mechanical Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | RSBU - Building Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSPL - Plumbing Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSEL - Electrical Final | Passed | Passed 8/13/25 | |
| 08/25/2025 | ENGR Engineering Final | Passed |