Permit: TC-MDP-0824-00968
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 169
Address NEW:
9125 E CATALINA HY BLDG 169
Apply Date:
09/16/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA3X2 T20-M0046
Permit Reviews
Permit Number - TC-MDP-0824-00968
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/26/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/02/2024 | APPROVED |
| 05/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2025 | APPROVED |
| 07/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/16/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00968
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Date | Description | Comments |
|---|---|---|
| 09/27/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/27/2024 | Post-Tension Inspection Report is required. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/27/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00968
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 1-22-25, not applicable. |
| 01/22/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 1-22-25, not applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00968
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 01/22/2025 | COT - RSPL - Sewer | Passed | 1-22-25, approved. Okay to backfill | |
| 01/22/2025 | COT - RSPL - Rough Soil | Passed | 1-22-25, underground plumbing verified as per approved plans. Okay to backfill with shading. | |
| 01/22/2025 | RSBU - Building Progress | Passed | ||
| 01/29/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 01/29/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 01/29/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 03/18/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/18/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/25/2025 | BULD - Electrical Clearance | Passed | Passed 4/25/25 CLEARANCE ECO | |
| 04/25/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 4/25/25 CLEARANCE ECO | |
| 04/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/05/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/13/2025 | COT - RSME - Mechanical Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | RSBU - Building Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | ENGR Engineering Final | Passed | Site in complete and in accordance with approved plans. | |
| 08/13/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSPL - Plumbing Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSEL - Electrical Final | Passed | Passed 8/13/25 |