Permit: TC-MDP-0824-00951
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 172
Address NEW:
9125 E CATALINA HY BLDG 172
Apply Date:
09/12/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045
Permit Reviews
Permit Number - TC-MDP-0824-00951
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/26/2025 | REQUIRES RESUBMIT |
| 07/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/11/2025 | APPROVED |
| 09/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/23/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00951
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Date | Description | Comments |
|---|---|---|
| 09/17/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/18/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/18/2024 | Post-Tension Inspection Report is required. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/18/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00951
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 12/19/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 12/10/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 06/04/2025 | ENGR Engineering Final | N/A | Not Ready | Parking area not completed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00951
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 10/29/2024 | COT - RSPL - Sewer | Passed | ||
| 10/29/2024 | COT - RSPL - Rough Soil | Passed | ||
| 11/08/2024 | COT - RSBU - Preslab | Passed | ||
| 11/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/08/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 12/10/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/10/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 01/29/2025 | BULD - Electrical Clearance | Passed | ECO Clearance issued to TEP for service at 9125 E Catalina Hwy Building 172. | |
| 01/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete per plans. Okay to proceed with installation of insulation and drywall on walls and ceilings. | |
| 01/29/2025 | COT - RSEL - Grounding/Bonding | Passed | Ground wire is properly secured to Ufer ground. | |
| 02/19/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly secured to studs per plan requirements of 4" & 7". Okay to proceed with tape, texture, and paint of walls and ceilings. | |
| 05/20/2025 | COT - RSEL - Electrical Final | Passed | ||
| 05/20/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/20/2025 | COT - RSME - Mechanical Final | Passed | ||
| 05/20/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/20/2025 | RSBU - Building Final | Passed | ||
| 06/16/2025 | ENGR Engineering Final | Passed |