Permit: TC-MDP-0824-00945
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 137
Address NEW:
9125 E CATALINA HY BLDG 137
Apply Date:
09/12/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045
Permit Reviews
Permit Number - TC-MDP-0824-00945
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/18/2024 | APPROVED |
| 07/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/22/2025 | REQUIRES RESUBMIT |
| 07/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/23/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00945
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Date | Description | Comments |
|---|---|---|
| 09/13/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/17/2024 | Post-Tension Inspection Report is required. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00945
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 1-22-25, not applicable. |
| 01/22/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 1-22-25, not applicable. |
| 08/04/2025 | COT - RSEL - Electrical Final | N/A | Not Ready | 08/04/25 Not ready |
| 08/04/2025 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | 08/04/25 Not ready |
| 08/04/2025 | COT - RSME - Mechanical Final | N/A | Not Ready | Not ready |
| 08/04/2025 | COT - RSPL - Plumbing Final | N/A | Not Ready | 08/04/25 Not ready |
| 08/04/2025 | RSBU - Building Final | N/A | Not Ready | Not ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00945
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2025 | COT - RSPL - Rough Soil | Passed | 1-22-25, underground plumbing verified as per approved plans. Okay to backfill with shading materials. | |
| 01/22/2025 | COT - RSPL - Sewer | Passed | 1-22-25, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials. | |
| 01/22/2025 | COT - RSPL - Yard Water Line | Passed | 1-22-25, previously inspected and approved by Robert Chandler. | |
| 01/22/2025 | RSBU - Building Progress | Passed | ||
| 01/29/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 01/29/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 01/29/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour. | |
| 03/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/11/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/24/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 04/24/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/07/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/7/25 ok to tape | |
| 08/15/2025 | COT - RSEL - Electrical Final | Passed | Passed 8/15/25 | |
| 08/15/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 8/15/25 | |
| 08/15/2025 | COT - RSME - Mechanical Final | Passed | Passed 8/15/25 | |
| 08/15/2025 | COT - RSPL - Plumbing Final | Passed | Passed 8/15/25 | |
| 08/15/2025 | RSBU - Building Final | Passed | Passed 8/15/25 | |
| 08/25/2025 | ENGR Engineering Final | Passed |