Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/12/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - TC-MDP-0824-00945
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
09/13/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/18/2024 APPROVED Review Details
07/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/22/2025 REQUIRES RESUBMIT Review Details
07/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0824-00945
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
09/13/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
09/17/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/17/2024 Post-Tension Inspection Report is required.
08/29/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00945
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
01/22/2025 COT - BULD - SWG Clearance N/A Not Applicable 1-22-25, not applicable.
01/22/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable 1-22-25, not applicable.
08/04/2025 COT - RSEL - Electrical Final N/A Not Ready 08/04/25
Not ready
08/04/2025 COT - RSEL - Outdoor Lighting N/A Not Ready 08/04/25
Not ready
08/04/2025 COT - RSME - Mechanical Final N/A Not Ready Not ready
08/04/2025 COT - RSPL - Plumbing Final N/A Not Ready 08/04/25
Not ready
08/04/2025 RSBU - Building Final N/A Not Ready Not ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00945
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/22/2025 COT - RSPL - Rough Soil Passed 1-22-25, underground plumbing verified as per approved plans. Okay to backfill with shading materials.
01/22/2025 COT - RSPL - Sewer Passed 1-22-25, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials.
01/22/2025 COT - RSPL - Yard Water Line Passed 1-22-25, previously inspected and approved by Robert Chandler.
01/22/2025 RSBU - Building Progress Passed
01/29/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour.
01/29/2025 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour.
01/29/2025 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly installed per plans, additional rebar is installed per plans, Ufer ground is installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island. Okay to proceed with concrete pour.
03/11/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/11/2025 COT - RSBU - Roof Nailing Passed
04/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/24/2025 BULD - Electrical Clearance Passed ECO
04/24/2025 COT - RSEL - Grounding/Bonding Passed
05/07/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/7/25 ok to tape
08/15/2025 COT - RSEL - Electrical Final Passed Passed 8/15/25
08/15/2025 COT - RSEL - Outdoor Lighting Passed Passed 8/15/25
08/15/2025 COT - RSME - Mechanical Final Passed Passed 8/15/25
08/15/2025 COT - RSPL - Plumbing Final Passed Passed 8/15/25
08/15/2025 RSBU - Building Final Passed Passed 8/15/25
08/25/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SITE PLAN BLDGS 137_V1.PDF DOCUMENTS VIEW
SIC BLDG 137-2024-09-12_V1.PDF DOCUMENTS VIEW