Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/17/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - TC-MDP-0824-00941
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
09/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/02/2024 APPROVED Review Details
07/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/25/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0824-00941
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
09/27/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/27/2024 Post-Tension Inspection Report is required.
08/29/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00941
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/06/2025 COT - BULD - SWG Clearance N/A Not Applicable
01/06/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
01/06/2025 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00941
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 18
Date Description Inspector Results Comments
01/06/2025 COT - RSPL - Rough Soil Passed
01/06/2025 COT - RSPL - Sewer Passed
01/06/2025 COT - RSPL - Yard Water Line Passed
01/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1-14-25, electrical underground, excavation/setbacks approved.
01/14/2025 COT - RSBU - Preslab Passed 1-14-25, preslab approved. Okay to pour concrete.
01/14/2025 COT - RSEL - Electrical Underground Passed 1-14-25, electrical underground, excavation/setbacks approved.
02/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 2/24/25 ok to drywall
02/24/2025 COT - RSBU - Roof Nailing Passed Passed 2/24/25 ok to drywall
04/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 4/18/25
04/18/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/18/25
04/22/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO 4/22/25
04/30/2025 COT - RSBU - Interior Shear Bracing Passed
07/14/2025 RSBU - Building Final Passed Passed final 7/14/25
07/14/2025 COT - RSPL - Plumbing Final Passed Passed final 7/14/25
07/14/2025 COT - RSME - Mechanical Final Passed Passed final 7/14/25
07/14/2025 COT - RSEL - Outdoor Lighting Passed Passed final 7/14/25
07/14/2025 COT - RSEL - Electrical Final Passed Passed final 7/14/25
08/20/2025 ENGR Engineering Final Passed Gates at back yard need to be installed.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152749 PT BLDG 159 COMPLETE-2025-07-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SIC BLDG 159-2024-09-17_V1.PDF DOCUMENTS VIEW
SITE PLAN BLDG 159_V1.PDF DOCUMENTS VIEW