Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0824-00939
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 157
Address NEW:
9125 E CATALINA HY BLDG 157
Apply Date:
09/17/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045
Permit Reviews
Permit Number - TC-MDP-0824-00939
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/02/2024 | APPROVED |
| 07/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00939
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Date | Description | Comments |
|---|---|---|
| 09/27/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/27/2024 | Post-Tension Inspection Report is required. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/27/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00939
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | NOT APPLICABLE--NO GAS ONSITE. |
| 02/05/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 2-5-25, not applicable. |
| 05/05/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | Work incomplete |
| 08/04/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | No roof access. |
| 08/04/2025 | RSBU - Building Final | N/A | Re-inspection required | No roof access to inspect mechanical. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00939
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and properly connected to the main sewer line. Entire system is under a water test. Okay to proceed with shading pipe and backfilling trenches. | |
| 01/29/2025 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and properly connected to the main sewer line. Entire system is under a water test. Okay to proceed with shading pipe and backfilling trenches. | |
| 01/29/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 01/29/2025 | RSBU - Building Progress | Passed | Underground plumbing is complete and properly connected to the main sewer line. Entire system is under a water test. Okay to proceed with shading pipe and backfilling trenches. | |
| 02/05/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2-5-25, excavation/rebar layout, setbacks and preslab approved. Okay to pour concrete | |
| 02/05/2025 | COT - RSBU - Preslab | Passed | 2-5-25, excavation/rebar layout, setbacks and preslab approved. Okay to pour concrete | |
| 02/05/2025 | COT - RSEL - Electrical Underground | Passed | 2-5-25, electrical underground approved. Okay to pour concrete. | |
| 03/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 3/6/25 ok to proceed to intermediate | |
| 03/06/2025 | COT - RSBU - Roof Nailing | Passed | Passed 3/6/25 ok to proceed to intermediate | |
| 04/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/24/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 04/24/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/09/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/9/25 | |
| 08/04/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/04/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/04/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/13/2025 | COT - RSME - Mechanical Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | RSBU - Building Final | Passed | Passed 8/13/25 | |
| 08/25/2025 | ENGR Engineering Final | Passed |