Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/17/2024
Applicant:
Cassidy Fenton
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - TC-MDP-0824-00936
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
09/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/02/2024 APPROVED Review Details
07/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/25/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0824-00936
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
09/27/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/27/2024 Post-Tension Inspection Report is required.
08/29/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00936
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/10/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
12/10/2024 RSBU - Building Progress N/A Not Applicable
12/10/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00936
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 18
Date Description Inspector Results Comments
12/10/2024 COT - RSPL - Rough Soil Passed
12/10/2024 COT - RSPL - Sewer Passed
12/10/2024 COT - RSPL - Yard Water Line Passed
12/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is evenly spaced and properly installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, additional rebar reinforcement is installed as required by plan, and 20 ' piece of rebar is installed for Ufer ground. Okay to proceed with concrete pour.
12/16/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is evenly spaced and properly installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, additional rebar reinforcement is installed as required by plan, and 20 ' piece of rebar is installed for Ufer ground. Okay to proceed with concrete pour.
12/16/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is evenly spaced and properly installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, additional rebar reinforcement is installed as required by plan, and 20 ' piece of rebar is installed for Ufer ground. Okay to proceed with concrete pour.
02/06/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2-6-25, exterior clip/sheathing inspection approved. Okay to continue with construction
02/06/2025 COT - RSBU - Roof Nailing Passed 2-6-25, roof nailing inspection approved
03/26/2025 BULD - Electrical Clearance Passed Passed 3/26/25 CLEARANCE ECO
03/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 3/26/25
03/26/2025 COT - RSEL - Grounding/Bonding Passed Passed 3/26/25
04/15/2025 COT - RSBU - Interior Shear Bracing Passed
07/08/2025 COT - RSME - Mechanical Final Passed Passed final 7/8/25
07/08/2025 RSBU - Building Final Passed Passed final 7/8/25
07/08/2025 COT - RSEL - Outdoor Lighting Passed Passed final 7/8/25
07/08/2025 COT - RSPL - Plumbing Final Passed Passed final 7/8/25
07/08/2025 COT - RSEL - Electrical Final Passed Passed final 7/8/25
08/04/2025 ENGR Engineering Final Passed Building is complete in accordance with approved plans.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152301 PT BLDG 148 COMPLETE-2025-07-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SIC BLDG 148-2024-09-17_V1.PDF DOCUMENTS VIEW
SITE PLAN BLDG 148_V1.PDF DOCUMENTS VIEW