Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/12/2024
Applicant:
Cassidy Fenton
Description:
DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)

Permit Reviews

Permit Number - TC-MDP-0824-00931
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Start Date Submittal Complete Date Status  
07/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/22/2025 REQUIRES RESUBMIT Review Details
09/13/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 09/18/2024 APPROVED Review Details
07/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0824-00931
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Date Description Comments
09/13/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
09/17/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/17/2024 Post-Tension Inspection Report is required.
08/28/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00931
Permite Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/24/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
02/24/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable site does not use gas
02/24/2025 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00931
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Completed Inspections - 18
Date Description Inspector Results Comments
02/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/24/2025 COT - RSBU - Roof Nailing Passed
02/24/2025 COT - RSEL - Electrical Underground Passed
02/27/2025 COT - RSBU - Preslab Passed
02/27/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
02/24/2025 COT - RSPL - Rough Soil Passed
02/27/2025 COT - RSPL - Sewer Passed
02/27/2025 COT - RSPL - Yard Water Line Passed
03/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3-21-25, residential intermediate approved. Okay to continue with construction.
04/04/2025 COT - RSBU - Interior Shear Bracing Passed Passed 4/4/25 ok to tape
05/20/2025 BULD - Electrical Clearance Passed SWG
05/20/2025 COT - RSEL - Grounding/Bonding Passed
07/17/2025 COT - RSEL - Electrical Final Passed
07/17/2025 COT - RSEL - Outdoor Lighting Passed
07/17/2025 COT - RSME - Mechanical Final Passed
07/17/2025 COT - RSPL - Plumbing Final Passed
07/17/2025 RSBU - Building Final Passed
08/25/2025 ENGR Engineering Final Passed