Permit: TC-MDP-0824-00924
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 167
Address NEW:
9125 E CATALINA HY BLDG 167
Apply Date:
09/16/2024
Applicant:
Cassidy Fenton
Description:
DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Permit Reviews
Permit Number - TC-MDP-0824-00924
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/14/2025 | REQUIRES RESUBMIT |
| 05/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2025 | APPROVED |
| 09/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/30/2024 | APPROVED |
| 07/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00924
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Date | Description | Comments |
|---|---|---|
| 09/23/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/24/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/24/2024 | Post-Tension Inspection Report is required. | |
| 08/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00924
Permite Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 12/02/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | NOT APPLICABLE--NO GAS ONSITE. |
| 01/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 1-16-25, add anchor bolts to marked areas along shear walls. |
| 01/31/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 1-31-25, not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00924
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | COT - RSPL - Rough Soil | Passed | ||
| 11/20/2024 | COT - RSPL - Sewer | Passed | ||
| 12/02/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 12/02/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 12/02/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 12/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 01/16/2025 | COT - RSBU - Roof Nailing | Passed | 1-16-25, approved. okay to continue with construction | |
| 01/17/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/17/25: Contractor has added redheads at joints in sole plate. | |
| 03/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | 3-21-25, interior shear bracing inspection approved. Okay for tape & texture. | |
| 04/18/2025 | BULD - Electrical Clearance | Passed | Ready for temp power 4/18/25 CLEARANCE ECO | |
| 04/18/2025 | COT - RSEL - Grounding/Bonding | Passed | Ready for temp power 4/18/25 CLEARANCE ECO | |
| 06/09/2025 | COT - RSEL - Electrical Final | Passed | passed final 6/9/25 | |
| 06/09/2025 | COT - RSEL - Outdoor Lighting | Passed | passed final 6/9/25 | |
| 06/09/2025 | COT - RSME - Mechanical Final | Passed | passed final 6/9/25 | |
| 06/09/2025 | COT - RSPL - Plumbing Final | Passed | passed final 6/9/25 | |
| 06/09/2025 | RSBU - Building Final | Passed | passed final 6/9/25 | |
| 06/16/2025 | ENGR Engineering Final | Passed |