Permit: TC-MDP-0824-00923
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 143
Address NEW:
9125 E CATALINA HY BLDG 143
Apply Date:
09/16/2024
Applicant:
Cassidy Fenton
Description:
DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Permit Reviews
Permit Number - TC-MDP-0824-00923
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/23/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/30/2024 | APPROVED |
| 07/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00923
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Date | Description | Comments |
|---|---|---|
| 09/23/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/24/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/24/2024 | Post-Tension Inspection Report is required. | |
| 08/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00923
Permite Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 12/10/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 12/10/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 08/04/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | No roof access. |
| 08/04/2025 | RSBU - Building Final | N/A | Re-inspection required | No roof access to inspect mechanical. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00923
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2024 | COT - RSPL - Rough Soil | Passed | ||
| 12/10/2024 | COT - RSPL - Sewer | Passed | ||
| 12/10/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 12/19/2024 | COT - RSBU - Preslab | Passed | 12-19-24, preslab verified as per approved plans. Okay to pour concrete | |
| 12/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-19-24, excavation/rebar/setbacks verified as per approved plans. Okay to pour concrete. | |
| 12/19/2024 | COT - RSEL - Electrical Underground | Passed | 12-19-24, electrical underground verified as per approved plans. Okay to pour concrete | |
| 02/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/13/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/01/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/23/2025 | BULD - Electrical Clearance | Passed | Will send pictures. | |
| 05/23/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/23/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/04/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/04/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/04/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/13/2025 | COT - RSME - Mechanical Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | RSBU - Building Final | Passed | Passed 8/13/25 | |
| 08/13/2025 | ENGR Engineering Final | Passed | Site in complete and in accordance with approved plans. |