Permit: TC-MDP-0824-00922
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 145
Address NEW:
9125 E CATALINA HY BLDG 145
Apply Date:
09/16/2024
Applicant:
Cassidy Fenton
Description:
DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Permit Reviews
Permit Number - TC-MDP-0824-00922
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/30/2024 | APPROVED |
| 07/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/24/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00922
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Date | Description | Comments |
|---|---|---|
| 09/23/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/24/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/24/2024 | Post-Tension Inspection Report is required. | |
| 08/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00922
Permite Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 12/10/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 12/10/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00922
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2024 | COT - RSPL - Rough Soil | Passed | ||
| 12/10/2024 | COT - RSPL - Sewer | Passed | ||
| 12/10/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 12/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is evenly spaced and properly installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, additional rebar reinforcement is installed as required by plan, and 20 ' piece of rebar is installed for Ufer ground. Okay to proceed with concrete pour. | |
| 12/16/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is evenly spaced and properly installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, additional rebar reinforcement is installed as required by plan, and 20 ' piece of rebar is installed for Ufer ground. Okay to proceed with concrete pour. | |
| 12/16/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is evenly spaced and properly installed, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, additional rebar reinforcement is installed as required by plan, and 20 ' piece of rebar is installed for Ufer ground. Okay to proceed with concrete pour. | |
| 02/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/13/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 03/26/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 3/26/25 | |
| 04/18/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 4/18/25 ok to tape | |
| 05/23/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 05/23/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/22/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/22/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/22/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/22/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 07/22/2025 | RSBU - Building Final | Passed | ||
| 08/18/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |