Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
12/10/2024
Applicant:
Description:
SFR RKK35G T21-M0090 (Model master plan TC-MDP-0123-00346)

Permit Reviews

Permit Number - TC-MDP-0824-00909
Permit Status: Inspections
Permit Description: SFR RKK35G T21-M0090 (Model master plan TC-MDP-0123-00346)
Start Date Submittal Complete Date Status  
12/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0824-00909
Permit Status: Inspections
Permit Description: SFR RKK35G T21-M0090 (Model master plan TC-MDP-0123-00346)
Total Outstanding Activity Conditions - 5
Date Name
08/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/18/2024 Post-Installed Anchor Inspection Report is required.
12/18/2024 Post-Tension Inspection Report is required.
12/18/2024 Soils Special Inspection required per provided SI Certificate.

Conditions

Permit Number - TC-MDP-0824-00909
Permit Status: Inspections
Permit Description: SFR RKK35G T21-M0090 (Model master plan TC-MDP-0123-00346)
Date Description Comments
08/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0824-00909
Permit Description: SFR RKK35G T21-M0090 (Model master plan TC-MDP-0123-00346)
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/29/2025 COT - RSPL - Yard Water Line Passed 1/29/25 pass OK to backfill, shading required.
01/29/2025 COT - RSPL - Sewer Passed 1/29/25 pass OK to backfill, shading required.
01/29/2025 COT - RSPL - Rough Soil Passed 1/29/25 pass OK to backfill, shading required.
02/06/2025 COT - RSEL - Grounding/Bonding Passed Rebar and hold downs per plan, electrical underground in place. Ok to pour concrete 2/6/25
02/06/2025 COT - RSBU - Preslab Passed Rebar and hold downs per plan, electrical underground in place. Ok to pour concrete 2/6/25
02/06/2025 COT - RSEL - Electrical Underground Passed Rebar and hold downs per plan, electrical underground in place. Ok to pour concrete 2/6/25
02/06/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and hold downs per plan, electrical underground in place. Ok to pour concrete 2/6/25
03/04/2025 COT - RSBU - Roof Nailing Passed 3 MAR 25
PASS
03/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3 Mar 25
Pass
03/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3-24-25, intermediate inspection approved. Okay to continue with construction.
03/24/2025 COT - RSPL - Gas Pressure Test Passed 3-24-25, approved.
03/25/2025 BULD - Electrical Clearance Passed Passed 3/25/25 CLEARANCE ECO
04/02/2025 COT - RSBU - Interior Shear Bracing Passed Passed 4/2/25 ok to tape
05/16/2025 COT - BULD - SWG Clearance Passed 05/16/25
Southwest Gas: SWG
06/04/2025 COT - RSME - Mechanical Final Passed
06/04/2025 RSBU - Building Final Passed
06/04/2025 COT - RSEL - Outdoor Lighting Passed
06/04/2025 COT - RSPL - Plumbing Final Passed
06/04/2025 RSBU - Building Progress Passed
06/04/2025 COT - RSEL - Electrical Final Passed
06/06/2025 ENGR Engineering Final Passed Site is clean and clear. CofO ready.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-12-10_V1.PDF DOCUMENTS VIEW