Permit: TC-MDP-0824-00907
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12732 E TORTOISE POINTE DR
Address NEW:
12732 E TORTOISE POINTE DR
Apply Date:
08/23/2024
Applicant:
Description:
SFR RKK35G T21-M0090
Permit Reviews
Permit Number - TC-MDP-0824-00907
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/25/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0824-00907
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 09/27/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/27/2024 | Post-Tension Inspection Report is required. |
| 09/27/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0824-00907
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Date | Description | Comments |
|---|---|---|
| 08/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00907
Permite Description: SFR RKK35G T21-M0090
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 12/6/24 Missing a few RSP on east side of structure. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00907
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2024 | COT - RSPL - Yard Water Line | Passed | 10-31-24, underground plumbing,sewer, main water line inspection approved, Okay to backfill-provide shading. | |
| 10/31/2024 | COT - RSPL - Sewer | Passed | 10-31-24, underground plumbing,sewer, main water line inspection approved, Okay to backfill-provide shading. | |
| 10/31/2024 | COT - RSPL - Rough Soil | Passed | 10-31-24, underground plumbing,sewer, main water line inspection approved, Okay to backfill-provide shading. | |
| 11/07/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-7-24, grounding/bonding approved. Okay to pour concrete. | |
| 11/07/2024 | COT - RSBU - Preslab | Passed | 11-7-24, preslab verified as per approved plans. Okay to pour concrete slab. | |
| 11/07/2024 | COT - RSEL - Electrical Underground | Passed | 11-7-24, approved. | |
| 11/07/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-7-24, setbacks verified as per approved plans. Okay to pour concrete slab. | |
| 12/06/2024 | COT - RSBU - Roof Nailing | Passed | 12/6/24 pass | |
| 12/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | corrections have been made | |
| 01/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to proceed 1/6/25 | |
| 01/06/2025 | COT - RSPL - Gas Pressure Test | Passed | Holds pressure 1/6/25 | |
| 01/07/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 1/7/25 | |
| 01/16/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1-16-25, interior shear wall inspection approved. Okay to tape & texture. | |
| 03/10/2025 | COT - BULD - SWG Clearance | Passed | 10 March 25 Southwest Gas clearance: SWG |
|
| 03/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 03/13/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/13/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/13/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/13/2025 | RSBU - Building Progress | Passed | ||
| 03/18/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/18/2025 | RSBU - Building Final | Passed |